Laserfiche WebLink
:. <br />16 <br />_00 4� <br />OGSB-10 ' <br />– + _ GSB-7 — - GSB-9GSB <br />r <br />. GSB-3 <br />JJJ j <br />1 Z, r •fir GSB-1 <br />I <br />•�f f I� _ <br />y1 ,R7' i t y <br />. T <br />Legend, <br />G Proposed Groundwater Screening Location (GSB) 7 1� <br />Proposed Muck Probe and Sediment Sampling Location > .� <br />0 Shallow Monitoring Well Location <br />0 10-11 Groundwater Monitoring Well Location (no well identification or construction details available) <br />0 Intermediate Monitoring Well Location <br />0 Piezometer installed by Geosyntec 2 December 2020 (screened 15 to 30 8 BLS) I �, 1 '1► �- [? <br />Surface Water Sample Location <br />O Geosyntec Soil Boring - November/Decomber 2020 (Sal and/or Groundwater Sampling Location) i! <br />Cross Section Transect A to A' <br />Approximate Location of Force Main 1 <br />----• Approximate Iridian River County Landfill Property Boundary <br />Q Approximate Waste Limits of Construction and Demolition (CBD) Debris Disposal FacilityProposed Additional Investigation Locations <br />Zone of Discharge of CBD Debris Disposal Facility Indian River County Landfill <br />Notes: N Vero Beach, Florida <br />1. ft BLS Indicates feel below land surface. Geo$yntec ° Figure <br />2. Locations identified as GPZ-1 to 3. CS -SWI, C5-SW3. LC-SW5, and LC-SW6 were based on Peavey and Associates <br />survey dated 4 January 2021. All other locations are estimated. Consultants <br />3. 2020 World Imagery Source: Esri, Maxar, GeoEye, <br />Eanhstar Geogrephics, CNES/Airbus DS. USDA, o too i <br />USGS, AeroGRID, IGN, and the GIS User Community. Feet Project No. FL3738 July 2021 <br />In: (nWsvlOe-0IWATA) T:10GISWL3738A IRGLWXDs120210T mD_AM lm n2107.mxd 02 July 2021. Lest Edited by: mhensley <br />