My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-125
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 2:28:22 PM
Creation date
9/7/2021 2:27:51 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />3 August 2021 <br />Page 6 <br />Nitrogen [TKN] and TN) and phosphorus species (TP and orthophosphate). The muck analytical <br />testing will be conducted by ENCO Laboratories (ENCO) of Orlando, Florida, the analytical <br />laboratory contracted with, and direct billed to SWDD. <br />The work plan for the tasks outlined in this proposal will be incorporated into the Draft <br />Supplemental Report prior to submittal to the FDEP for approval. Geosyntec will request FDEP <br />approve the scope of work prior to initiating the scope of work detailed in this Task. <br />Geosyntec assumes the areas where the groundwater screening is planned will be cleared by <br />SWDD and SWDD will provide assurance that the drilling areas are'clear of subsurface utilities; <br />otherwise, a subsurface utility survey will be performed prior to initiating work. <br />Phase 4 — Data Evaluation and Summary Report <br />Following completion of Phases 2 and 3, Geosyntec will review the data and prepare a summary <br />report. This report will be prepared as an Addendum to the Draft Supplemental Report and a. <br />draft copy will be submitted to SWDD for review and comment. Following receipt of SWDD <br />comments this Addendum and the Draft Supplemental Report will be finalized for submittal to <br />FDEP. <br />SCHEDULE <br />Geosyntec will initiate work immediately upon receipt of Notice to Proceed (NTP) from SWDD. <br />A Draft version of the Draft Supplemental Report will be submitted to SWDD within 30 days of <br />receipt of laboratory analytical data. The scope of work detailed in this proposal is expected to <br />be completed within 4 months of authorization. Other technical and miscellaneous permit <br />compliance support services will be provided on an as -needed basis. <br />BUDGET ESTIMATE <br />Geosyntec proposes to perform the above -referenced work on a lump sum basis for $66,159.85. <br />A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment 1. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />project requirements, our experience gained from executing similar tasks for SWDD and <br />experience with compliance monitoring and reporting at similar facilities. <br />Phase 1 — Project Management/Meetings $9,547.22 <br />Phase 2 — Historical and As -Built Documents Review $12,945.10 <br />NCP2020-3158/JL21057 GW Compliance Technical Support Services.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.