Laserfiche WebLink
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and All Webbs <br />Enterprises, Inc., (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the <br />mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Furnish all labor, equipment and materials necessary to deepen and test two (2) existing <br />Upper Floridan Aquifer wells (Well N7 and Well S1) for Indian River County Utilities <br />Department (OWNER). Well N7 located at the North County (Hobart Park) reverse osmosis <br />treatment facility and S1 is located at the South County (Oslo Road) reverse osmosis <br />treatment facility. The scope of work for each well will include: mobilization; removal of <br />portions of the existing wellhead, removal of the column pipe, pump, and appurtenances; <br />preliminary downhole video logging; deepening of the existing borehole; formation water <br />disposal system (including temporary piping and pumps, and compliance with discharge <br />permit requirements); performance of a full geophysical logging suite; installation of a <br />straddle packer and performance of a packer test to evaluate the confining unit; Installation <br />of an off bottom packer and performance of a 24-hour constant rate aquifer performance <br />test (APT) of the Avon Park Permeable Zone (AAPZ); performance of a 24-hour constant rate <br />APT of the Upper Floridan Aquifer (UFA); optional back -plugging of the borehole with neat <br />cement; optional well acidization; pump development; step -drawdown testing; re- <br />installation of the permanent well pump, column pipe, and wellhead; well facility <br />disinfection; purging and bacteriological clearance; demobilization and restoration of the <br />well sites as described herein. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Well Field Feasibility Expansion <br />ProjectAddress: South County Reverse Osmosis Water Treatment Plant <br />North County Reverse Osmosis Water Treatment Plant <br />ARTICLE 3 - CONTRACT TIMES <br />3.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for Final <br />payment as stated in the specifications are of the essence of the Agreement. <br />6 <br />3.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />ti <br />