My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-179
CBCC
>
Official Documents
>
1990's
>
1996
>
1996-179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 12:57:41 PM
Creation date
9/27/2021 12:42:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/06/1996
Control Number
1996-179
Entity Name
Allcomm Network, Inc.
Subject
Fiber Optic Installation
Bid Number
IRC-6080
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 4770-5140 Ju 1 0 C 15 P .02 <br />Iridian River Coundy <br />IRC Bid #6080 <br />Fiber Optic Cable Installation <br />96-1701-2 Prclject <br />A.I.)UENUIJM N0. I <br />July 9; 1996 <br />Rid Openitig Date: *July 17, 1996 <br />Thne .2:00 hill. <br />Pleas- not., the following clarilicati6ns and/or changes in this Bid pursuant to the pre-bid meeting <br />held m July 8, 1996 in tate First Floor Cotiference }loom ol'the Comity Administt-ation Building. <br />i <br />1. Certain areas oi'thc project tine considered wet or de-wmering areas. Areas <br />mentioned were southbound along 66111 and eastbound along; 41 m. This is not all <br />the areas flint may require dewatering clue to weather conditions during the <br />installation. Rtfie)-envet 2.2.7 Page /9 where Contractor is required to design and <br />prrtinnt dc•wateriuK na necessary in accordance with ), regulations, <br />2. Road closings are not anticipated; however, any closings that may be require <br />will require a 24 hour notice to the County heline such closing ns well as perfor <br />such activities in accordance with Mt17'C'U and FUnT traffic control standard, <br />rclarenced in General Note I of the plans sheet P,1. <br />3. Directional Bore method is an acceptable alternate to Jack and Hare through <br />the project. All hares shall be of the sante size and quantity of the conduit plan <br />un either side of the required bore arca. (Example: 2" bore to attach 2" PVC on <br />tither side of bore area, (road, canal, for convenlence) ). <br />4. Rolled PVC is an acceptable alternate to the 2" stick PVC, TC:6 specified in <br />Scetlon 3.1.4. <br />S. Notation "13OP" slands for Back of Pavement. <br />6. Modify the hid to accommodate histatlation of conduits al the North Tower <br />site to be installed via directional bore method at the centerline ol'the entrance <br />road or at least 48" nway from the existing water main facility to be located opo <br />Initiating the contract. <br />7. Modify the bld to accommodate the movoment of the North Tower entrance <br />from Equipment Room 0l to Room 112. This will extend the hand dig around tlI <br />facility 30-50 feet. <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.