ORDER NO. PSC -2021 -0252 -PAA -EQ
<br />DOCKET NO. 20210067 -EQ
<br />PAGE 9
<br />IFIDRIVAPOWER & LIGHT COMPANY
<br />(Continued from Sheet No. 9.032)
<br />3,2 QS, tit no cost to FPI, shall be responsible W
<br />Attachment A
<br />First Revi-ed.Stwef No. 032.1
<br />Cancels Orlonal ShcetNo. 9.032.1
<br />.3.2.1 Design, construct; rand ittaintaim the riciliry in accordance with this Contract, appticablelace: regulalory, and
<br />governmental approvals, any requirements of warranty agreements or similar agteealents, prudent indusfty practice,
<br />instirunole policies, and the hilerconaection Agreebient: orAlteLling Agreement.
<br />3.21 Perform all stltdies,.pay all fees, obtain all Al
<br />thelmercomectionAgreementor the WheetingAgreernalt(s)) in order to schedule and deliver the firm capacity and
<br />energy to PPL.
<br />3.23 Obtain and maintain all permits, certifications, licenses, consents or approvals ofarty governmental or regulatory
<br />authority necessary for the construction, operation, and maintenance of the Facility (the QS shall keep FPL
<br />reasonably informed as to die stutils ofits permitting efforil; mid shall promptly inform FPL ofany Pertnits it Is unable to
<br />obtain, that are delayed, hinited, mispended, teratinited, or otherwise constrained in a way that could limit, reduce,
<br />interfere with, or preclude utility to perform its obligations under. this Contruct tincluding a staternerit of'whetha and
<br />to what extent this circumstance mayfinfit or preclude QS's ability to I)Lribrm under this Contract)
<br />3.2.4 Demonstrate to rPL*s toWnable satisfaction dial. QS has established Site Cation, an agreement for file
<br />ownership or Ime ofilte Facility's site,.for the Tema of the Contract.
<br />3.2.5 Complete allent, tronmental impact studies and comply with applicable environmental laws necessary for the
<br />construction, operation, and iminteriaride of the Facility.
<br />3,16 At FPUs request, provide to FPL etectrical specifications and d-,.qgn drawingspemifil#kto
<br />for,FPL'srevicii,ptiortofinAi2iiigdesi ofthe Facility and before begirming.consiniction
<br />9A — . . sC'pn,suelt
<br />speoificotiom and drawings, provided r-PUs review ofsoolispecifications and design shall not tv
<br />the spocificali(m, and design thereof, or many express or inoidd warnudies including performance, safety, durability or
<br />reliability ofthe Facility. QS shill provide to FPL reasonable advance notice orany chaliges in the Favil .1 ity mid .1 provide
<br />to FP1,specificatims und design dwitingsofarty such changes,
<br />3.2.7 XVithin fifteen (I S) days after the close ofeach thanth from the first month following the Effective Date until the
<br />Capacity Delivery Date, provide to PPL a monthly progress report (in a form reasonably satisfactory toA)�) and.agwe to
<br />regularly scheduled meetings between representatives orQS and FPL to review such monthly reports and discuss QS*s
<br />ooilstruttion progress. The Monthly Progress. Report shall:irldicate whether QS is on target to meet the Capacity Delivery
<br />Date, If for any reason, FPI, has reason to believe thatQS.mziy,fajI to achieve the Capacity Delivery Date, then, upon,
<br />FPL's request, QS shall submit to VPL, widiiin ten (10) bainegs days of such request, a remedial action plan CReinedial
<br />Action Plan) are( sets forilta detailed description ofQSs proposed co=c ofactio n to promptly achicyc the Capacity
<br />Delivery Date, Delivery ofa Remedial Action Plan docnot relieve Qs of its obligation to meet One Capacity Delivery
<br />Date.
<br />33 FPL shall have the right, but: not the obligation„to;
<br />131 Impect (hiring bu,44ness hours up(mireasonable notice, or obtain copies of all Pemliti IwId by QS,
<br />3.3,2 Consistent with Section 31.2.6. notify QS in writing of the:results of the review within thirty (10) days orFPL's
<br />receipt of all specifications for (he Facility, including description of any flaws perceived by FPL in die dest9p,
<br />133 Inspedthe rucility',, construction site or on-silc QS data and information pertaining to aid Facility during
<br />business hours upon reasonable notice.
<br />(Continued on Shed No. 9,03.1)
<br />Ismed1by: &E.Rofidg,Director, Rates and Tariffs
<br />Effective. September 13, 2016
<br />
|