My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/17/2021
CBCC
>
Meetings
>
2020's
>
2021
>
08/17/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:27:13 PM
Creation date
10/14/2021 9:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/17/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2021 -0252 -PAA -EQ <br />DOCKET NO. 20210067 -EQ <br />PAGE 32 <br />Attachment A <br />Sheth Re--+wd Sheet No. 10.305 <br />nA)RIDA PQSVFR & LIGHT. COMPANY Cancels Fifth Revlwd Sheet No. 10-305 <br />(Coniirated from Slee[ No. 10.304) <br />DFI.IVFRY VOI,TAGF AD.R35TMFNT <br />]anergy payments .to a QS. within the Company's service territory shall be adjusted according :to the delivery voltage by the <br />multipliers provided in Appendix 13. <br />PM''DRtilANC F C -R1 TF R1:A <br />Payments for Firm Capacity are conditioned on the QS-, ability to maintain the ,following performance criteria: <br />A. Capacity mlivery;Date <br />The Capacity DeliveryDate shall be no later than the projected in-service date of the Company's Avoided Unit, as detailed <br />in Appendix IL <br />11 &vii I I a b I I I h,, attd CaPacIty I+actor <br />The Facility's, availability and capacity factor are used in the determination of frim capacity payments through a <br />performance based calculation as detailed in Appendix 13 to the Crnnpanys Standard Offer Contract <br />MFT'FJtLNt;.RFpLTiRFN-TENTS <br />A QS within the territory served by the Company shall he: required to purchase from the Company hourly recording meters to <br />measure their energy deliveries to the Company. Energy purchases from a QS outside the territory of the Company shall be <br />measured as thequantities,scheduled for interchange to the Company by the entity delivering Finn Capacity and Renewable <br />Energy to the Company. <br />For the purpose of this Schedule, the on -peal` hours shall be those hours occurring April I through October 31 Mondays: through <br />Fridays from 12 noon to 9:00 pm. xluding Memorial Day, Independence Day and Laboo-.Daya,and 5 6vember 1 through .March <br />31 Mondays through Fria <br />Fridays from 6.00 a.m. to 10:00 a:m: and 6:00.p.m, to as p.tn: preialing''1 astern time excluding <br />Thanksgiving Tray, Christmas Day, and New Years Day., Fl?I sh 1, V),� the rig rp ch( e sucts� a -Peak FI<Iin by providing <br />the QS a minimum of thirty calendar days' advance written notice. <br />]ULLING OTMONS <br />A QS, ul)on entering into a Standard Offer Contract for the sale of fine capacity and energy or prior to delivery of as -available <br />energy; may elect to make either simultaneous purchases from and. sales to the Company, or net stiles to the Company; provided, <br />however, that no such arrangement shall cause the QS to sell more than the Facility's net output. A decision on billing.methods <br />may only be changed: l). when a QS selling as -available_ energy enters into a. Standard Offer C".ontnict for -the -sale of firm capacity <br />and energy; 2) when a Standard Offer Contract expires or is lawfully terminated by either the QS or the Company, 3) when the <br />Q5 is selling asavailable energy and has not changed billing methods within the ,last twelve months, A) when the election to <br />change billing methods will not contravene this Tariff or the - contract between the QS and the Company. <br />If a QS elects to change billing methods, such changes shall be subject to the following: 1) upon at least. thirty days advance <br />written notice to the.C:on pang; 2) the installation by the Company of any additional metering equipment reasonably required to <br />effect the change in billing mrd upon payment by the QS for such metering equipment and its installation; and 3)upon completion <br />and approval by the C'ompyany of any alteration(s) to the interconnection reasonably required to effect the charge in billing and <br />upon layment by the QS for such alteration(s). <br />Payments due a QS will be made monthly and normally by the twentieth business day following the end of the billing period. The <br />kilowatt-hours sold by'the QS and the applicable avoided energysates at which payments are being. made shall.accompany the <br />payment to the QS. <br />A statement covering the.charges and payments due the QS is renderedmonthly, and payment normally is.made by the twentieth <br />business day.following:the end of the billing period. <br />(Continued on,Sheet,No. 10.30ii) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective::June25; 2013 <br />1-M <br />
The URL can be used to link to this page
Your browser does not support the video tag.