My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/17/2021
CBCC
>
Meetings
>
2020's
>
2021
>
08/17/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:27:13 PM
Creation date
10/14/2021 9:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/17/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2021 -0252 -PAA -EQ <br />DOCKET NO. 20210067 -EQ <br />PAGE 45 <br />Attachment A <br />I-AkitIJ (,'U]NIVANY. UnginalNheet.No-10.315 <br />APPENDMID <br />TO THE STANDARD OFFER CONTRACT <br />IDETAMED PROJECT ]INFORINIATION <br />Fach eligible Contract received by PPI, will he evaluated to daterntine ifthe underlying Qg:project is financially and technically viable, 'Me <br />QS shall, to the extent available, provide FPL with a detailed projectlyrapoval which addresses the infounation requested below. <br />1. FACIL]ITY DESCRIPTION <br />• Project Name <br />• Project Location <br />+ Street Address <br />Site Plot Plan <br />Legal Descrimion of Site <br />.0 Ginerating Technology <br />Facility. clamification (include types florn statute) <br />Primary Fuel <br />• Altertwe Fuel tifopplical5k) <br />• Corlunitted Ca lme-ity <br />• ENIXected In-Scmice Date <br />• Stearn Host (forengenerntion Acilitics) <br />+ Street Address <br />+ Legal Desciiption of Steam Host <br />.Host's armutil skarn requirements (ltjsyr) <br />• Contact. Person <br />4 InMridual'& Nante and Tifle <br />CoutpanyNanie <br />• Address <br />Telephone Number <br />• Tdcoopy Number <br />III, PROJECT P-ARTICIPIMS <br />indicate the entities rcspoasiblc fbr the following projoctinanagoment activities and provide a detailed description of the <br />experieute and capabilities ofthe entities; <br />4 Project Development <br /># Siting and Licensing the Facility <br /># Desipfing the Facility <br />0, Constructing the Facility <br />* Securing the Fuel Snpply <br />+ Operating ate Facility <br />Provide details oil all electrical generation f4cilities which are currently under cowstruction or operational which were <br />41mloped-by the Qs. <br />• Describe the financing structure for the projects identifi.ed above, including the:type offinalleing used, the p6mianeut framing <br />term, the major lenders, and the Percentage of equity invested at financial closing; <br />(Continued oil Shed No. 10.316) <br />.Issued by-, S. F. Rant 1g, DirectorRalos and Tariffs <br />Effective: May22,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.