Laserfiche WebLink
ORDER NO. PSC -2021 -0252 -PAA -EQ <br />DOCKET NO. 20210067 -EQ <br />PAGE 47 <br />_N 1:C)lEilJtiil"V W!✓K 6t <br />{Continued from Sheet No. 10.316) <br />IV. PLANT DISPATC'HABLLITY/CONTROLLABILITY <br />Attachment A <br />.. Provide the following operating characteristics and a detailed, explanation supporting the performance capabilities indicated; <br />4 Ramp Rate (MW/r ingte) <br />• Peak Capability (% above.Crnnmitted Capacity) <br />♦ Mininjuni pow sr levele(% of Committed Capacity) <br />-• Facility Tu naround Tin*1 Hot to:Hot .01ours) <br />Siert-up Time; frorn Cold Shutdown (hours) <br />s unit Cycling (if cyclesiyT) <br />♦ MNV and MVAR Contra (AGC;, Manual, Other (please explain)) <br />V. $1TINGAND L14CENS1NC <br />• ;provide a icettcinglperinif(ing milestone schedule which lists all pertnits, licenses :and variances requircd tositethe Facility, <br />Thealso idenft'ry'Ley milestone, daics-fort ba etirla ntonirorir�-appiica6ori.lrrep iratir>n, ragenc�� review, <br />certification and liccroinglsitingboard approval, and agency permit i -mane, <br />• Provide a li'cenStrig/permittmi; )Pian that addrcssea the ,issues of air enusaons, water use, wastewater 'd seharge, wetlands,, <br />endangered species, protected properties, solid waste, surrounding land use, xoning.for the Facility, associated linear facilities, <br />and.support of and opposition to he Facility. <br />• last the emission/effluent discharge linfits the Facility will meet, and describe in detail,die pollution ccaritrol equipment to be <br />used to meet these limits. <br />V.I. PACII:,ITY DEVELOPNII NT AND PERFORMANCE <br />• Submit a detailed engineering, procurement, construction, startup and conanerciial operation schedule. The schedule stunt <br />include milestones for site acquisiiionr engineering tShascs, selection of#lac major. equipincut. vendors, architect cngjncer,'EPC <br />contractor, and Facility; operatorslearirhost integrationsareal delivery of.trwjor equipment, A dismission ofthe current status of <br />each milestone should also be included where applicable. <br />• Attach a diagram of the power block arriulgenietrt. Provide a list of the major equipment vendors and the nameand.model <br />number of the major equipment to be installed. <br />• Provide a detailed description of the proposed environmental control technology for, the.Facility and describe the capabilities <br />of the proposed teehnology. <br />• Attach preliminary flow diagrams for the steam system, water.", cm, and fisc ssysfem,'and 'a attain electrical one line diagram <br />for the Facility, <br />•-State tete expected lheat rate (HHV) at 75 degrees Fahrenheit for ,loads of 1001/4, 7510, and: 50/o. lit addition, attach a <br />preliminary heat balance for the Facility. <br />•: [NGFE:. add any.requiiements related to demonstrating that the facility meets the requirements under the statute or applicable' <br />tales]. <br />(Continued on Sheet No. 10.318) <br />Issued by: S. E. -Romig, Director, Rates and Tariffs <br />Effective-.. May 22;2007 <br />