My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-142
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2021 9:28:26 AM
Creation date
10/19/2021 9:27:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/21/2021
Control Number
2021-142
Agenda Item Number
8.Q.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
Sector 5 Additional Dune Planting, and Dune Vegetation Services, Work Order No. 2018029-7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q A PT I M <br />specifications will be incorporated without duplication or conflict in terms and conditions. <br />Deliverables <br />APTIM will provide the County an electronic version of the draft plans and specifications for the County's <br />review and comments. Once finalized, we will submit one (1) hardcopy of the construction plans (11 "X17") <br />and technical specifications (8.5"x11") to the County. We will also submit an electronic copy of the final <br />version of the construction plans and technical specifications to the County. <br />Schedule <br />This task will begin upon approval from the County to proceed with this work order. It is anticipated that <br />30 days will be required to complete the dune vegetation design. At such time, a draft design will be <br />provided to the County for its review and comments. Once approved by the County, the Sector 5 Plans <br />and Specifications will be updated within 10 days to address any County comments. <br />Task 2. Construction Administration and Certification <br />APTIM will provide project management of technical, environmental and administrative tasks necessary <br />to administer the project dune vegetation planting. A representative will observe the dune planting and <br />provide observation reports. <br />Deliverables <br />APTIM will provide observation reports following dune planting observations. After completion of <br />vegetation planting, APTIM will prepare a project certification report. <br />Schedule <br />The schedule of task specific deliverables is provided in the Scope of Work for this task. An overall fixed <br />schedule cannot be developed as the Contractor's schedule is unknown. APTIM will attempt to execute <br />each phase of the work in as expeditious a manner as possible. <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Sector 5 — 2018029 — Work <br />Order #7 is $48,021. Please refer to Exhibit A, attached to the end of this proposal, for a summary of the <br />costs and labor hours of each Task. APTIM will proceed with the tasks upon receipt of a signed work <br />order from the County (unless stated otherwise in the schedule). APTIM will strive to execute each phase <br />of the work within budget and in as expeditious a manner as possible. We will coordinate with the County <br />if deviations from the scope, schedule or budget arise due to unforeseen issues or circumstances. <br />IRC Sector 5 — 2018029— WO#7: Dune Vegetation Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.