My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-154
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 3:35:34 PM
Creation date
10/19/2021 1:49:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2021
Control Number
2021-154
Agenda Item Number
8.G.
Entity Name
DiVosta Homes, LP
Subject
Modification to Contract for Construction for Extension to Final Lift of
Asphalt, Magnolia Court at Waterway Village PD – Pods H, I, J
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Magnolia Court at Waterway Village PD (Pods HJ,J) <br />FINAL LIFT BOND - OPC <br />STATE OF FLORIDA <br />INDIAN RIVER COUNTY <br />THIS IS TO CERTIFY THAT THIS IS A TRUE AND CORRECT <br />CO(OffHE ORIGINAL ON FILEAN THIS OFFICE.,, <br />I I 0 JEFFREY R. SMITH. ARK. / I <br />D <br />9/15/2021 <br />TOTAL I 1 $ 111704.60 <br />PROPOSED BOND AMOUNT (125%) $ 139 630.75 <br />Kimley HerhVnd Assoctes; 1pf. <br />�` � SPR �l`�•`''Sy� ';� 1 <br />Cf <br />K nap-Husainy, P. :' LL _ <br />FL" R%47S481 <br />NifnAO), * 'rn <br />The Engineer has no control over the cost of labor, materials, equipment—or over the contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided hereinarebased on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals; <br />bids, of actual construction costs will not vary from its opinions of probable casts. <br />i <br />DIVIS ON <br />ACCOPted <br />�nsuffi1cie — <br />t <br />PAVING <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT.C)ST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods H, 1) <br />I 9,070 <br />SY <br />$ <br />9.78 <br />$ <br />88,704.60 <br />STRIPING <br />1 <br />LS <br />$ <br />7,000.00 <br />$ <br />7,000.00 <br />SET PRM'S, PCP's, LOT CORNERS <br />1 <br />LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />SIDEWALK AT ROADWAY STUBS <br />2 <br />EA <br />$ <br />3,000.00 <br />$ <br />6,000.00 <br />TOTAL <br />1 <br />$ <br />111,704.60 <br />TOTAL I 1 $ 111704.60 <br />PROPOSED BOND AMOUNT (125%) $ 139 630.75 <br />Kimley HerhVnd Assoctes; 1pf. <br />�` � SPR �l`�•`''Sy� ';� 1 <br />Cf <br />K nap-Husainy, P. :' LL _ <br />FL" R%47S481 <br />NifnAO), * 'rn <br />The Engineer has no control over the cost of labor, materials, equipment—or over the contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided hereinarebased on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals; <br />bids, of actual construction costs will not vary from its opinions of probable casts. <br />i <br />DIVIS ON <br />ACCOPted <br />�nsuffi1cie — <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.