Laserfiche WebLink
Magnolia Court at Waterway Village PD (Pods HJ,J) <br />FINAL LIFT BOND - OPC <br />STATE OF FLORIDA <br />INDIAN RIVER COUNTY <br />THIS IS TO CERTIFY THAT THIS IS A TRUE AND CORRECT <br />CO(OffHE ORIGINAL ON FILEAN THIS OFFICE.,, <br />I I 0 JEFFREY R. SMITH. ARK. / I <br />D <br />9/15/2021 <br />TOTAL I 1 $ 111704.60 <br />PROPOSED BOND AMOUNT (125%) $ 139 630.75 <br />Kimley HerhVnd Assoctes; 1pf. <br />�` � SPR �l`�•`''Sy� ';� 1 <br />Cf <br />K nap-Husainy, P. :' LL _ <br />FL" R%47S481 <br />NifnAO), * 'rn <br />The Engineer has no control over the cost of labor, materials, equipment—or over the contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided hereinarebased on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals; <br />bids, of actual construction costs will not vary from its opinions of probable casts. <br />i <br />DIVIS ON <br />ACCOPted <br />�nsuffi1cie — <br />t <br />PAVING <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT.C)ST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods H, 1) <br />I 9,070 <br />SY <br />$ <br />9.78 <br />$ <br />88,704.60 <br />STRIPING <br />1 <br />LS <br />$ <br />7,000.00 <br />$ <br />7,000.00 <br />SET PRM'S, PCP's, LOT CORNERS <br />1 <br />LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />SIDEWALK AT ROADWAY STUBS <br />2 <br />EA <br />$ <br />3,000.00 <br />$ <br />6,000.00 <br />TOTAL <br />1 <br />$ <br />111,704.60 <br />TOTAL I 1 $ 111704.60 <br />PROPOSED BOND AMOUNT (125%) $ 139 630.75 <br />Kimley HerhVnd Assoctes; 1pf. <br />�` � SPR �l`�•`''Sy� ';� 1 <br />Cf <br />K nap-Husainy, P. :' LL _ <br />FL" R%47S481 <br />NifnAO), * 'rn <br />The Engineer has no control over the cost of labor, materials, equipment—or over the contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided hereinarebased on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals; <br />bids, of actual construction costs will not vary from its opinions of probable casts. <br />i <br />DIVIS ON <br />ACCOPted <br />�nsuffi1cie — <br />t <br />