My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-160
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2021 12:07:19 PM
Creation date
10/19/2021 2:45:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/05/2021
Control Number
2021-160
Agenda Item Number
8.N.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Amendment 1 to Work Order No. MM-2 for Moorhen Marsh Leaps- Mechanical Construction Phase Services
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 Work Order MM -2 <br />Moorhen Marsh Mechanical Construction Phase Services <br />given in the Contract Documents. Such review and approvals or other action will <br />not extend to means, methods, techniques, equipment choice and usage, <br />schedules, or procedures of construction or to related safety programs. <br />Below is a list of anticipated mechanical shop drawings and associated specification <br />section; <br />• Headworks Slide Gate (11016) <br />• Flow Meters — Electromagnetic Flow Meters (11020) <br />• Headworks Submersible Pumps and Appurtenances (11300) <br />• Portable Water Lettuce Supernatant /Sludge Pump (11304) <br />• Duperon Harvestrake (11400) <br />• Ductile Iron Pipe and Fittings (15051) <br />• Polyvinyl Chloride (PVC) Pipe and fittings (15152) <br />• Valves and Appurtenances (15100) <br />6. Substitutes and "or -equal." Consultant will evaluate and determine the acceptability <br />of substitute or "or -equal" materials and equipment proposed by Contractor in <br />accordance with the Contract Documents. <br />7. Inspections and Tests. Consultant may require special inspections or tests of <br />Contractor's work as Consultant deems appropriate, and may receive and review <br />certificates of inspections within Consultant's area of responsibility or of tests and <br />approvals required by laws or the Contract Documents. Consultant's review of <br />certificates will be for the purpose of determining that the results certified indicate <br />compliance with the Contract Documents and will not be an independent evaluation <br />that the content or procedures of such inspections, tests, or approvals comply with <br />the requirements of the Contract Documents. Consultant shall be entitled to rely on <br />the results of such test <br />8. Disagreements between COUNTY and Contractor. Consultant will, if requested by <br />COUNTY, render written decision on all claims of COUNTY and Contractor relating to <br />the acceptability of Contractor's work or the interpretation of the requirements of <br />the Contract Documents. In rendering decisions, Consultant shall be fair and not <br />show partiality to COUNTY or Contractor and shall not be liable in connection with <br />any decision rendered in good faith <br />9. Applications for Payment. The COUNTY will review and approve all applications for <br />payment submitted by the Contractor <br />31 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.