My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-160
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2021 12:07:19 PM
Creation date
10/19/2021 2:45:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/05/2021
Control Number
2021-160
Agenda Item Number
8.N.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Amendment 1 to Work Order No. MM-2 for Moorhen Marsh Leaps- Mechanical Construction Phase Services
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br />Moorhen Marsh - Mechanical Construction Phase Services <br />EXHIBIT C - PROPOSED STAFF HOURS AND FEE <br />1 <br />PM/SR <br />SR PROFESSIONAL <br />PRINCIPAL <br />(ENGINEER) <br />ANALYST <br />ADMIN <br />TOTAL HOURS <br />$250.00 <br />&185.00 <br />$125.00 <br />$75.00 <br />Task 1 - Mechanical Construction Phase Services <br />Shop Drawing Review (Specification Section) <br />Headworks Slide Gate (11016) <br />1.0 <br />1.0 <br />3.0 <br />5.0 <br />Flow Meters - Electromagnetic Flow Meters (11020) <br />2.0 <br />3.0 <br />5.0 <br />Headworks Submersible Pumps and Appurtenances (11300) <br />1.0 <br />2.0 <br />3.0 <br />6.0 <br />Portable Water Lettuce Supernatant /Sludge Pump (11304) <br />1.0 <br />3.0 <br />4.0 <br />Duperon Harvestrake (11400) <br />2.0 <br />3.0 <br />5.0 <br />Ductile Iron Pipe and Fittings (1505 1) <br />1.0 <br />3.0 <br />4.0 <br />Polyvinyl Chloride (PVC) Pipe and fittings (15152) <br />2.0 <br />3.0 <br />5.0 <br />Valves and Appurtenances (15 100) <br />1.0 <br />3.0 <br />4.0 <br />Shop Drawing Resubmittal <br />6.0 <br />6.0 <br />12.0 <br />Review Equipement Subsitutes <br />6.0 <br />6.0 <br />Test Report Reviews <br />4.0 <br />4.0 <br />Anticipated Site Visits (4 total) <br />Headworks Submersible Pump startup <br />6.0 <br />6.0 <br />Portable Water Lettuce Supernatant/sludge pump <br />6.0 <br />6.0 <br />Duperon Flexrake installation/startup <br />6.0 <br />6.0 <br />Piping installation and pressure testing <br />6.0 <br />6.0 <br />Coordination with County's inspector for pipe installation as needed <br />8.0 <br />Final Completion <br />8.0 <br />12.0 <br />20.0 <br />O&M Review <br />6.0 <br />10.0 <br />EJCDC SC & FC Paperwork <br />2.0 <br />4.0 <br />Record Drawings Review <br />4.0 <br />8.0 <br />Assist County with RFPs <br />-.0 <br />8.0 <br />1 o.n <br />Administrative Support <br />4.0 <br />Task 2Total <br />S1,()()0.00 <br />$16,280.00 <br />$8,000.00 <br />$300.00 <br />$25,580.00 <br />Total <br />$25,580.00 <br />Labor Fee S25,580.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.