Laserfiche WebLink
IRC— Professional Services <br />APPENDIX A <br />SIOGAS ENGINEERING <br />2021 Hourly Rate Schedule <br />Principal________ ----------------------------------------------------------- <br />$230 <br />Project/Technical Director <br />$2.1.0 <br />Sr. Process Engineer/Sr. Controls Engineer_________________________ <br />------------ $190 <br />Project Manager/Lead Engineer ______________ ------------------------------- <br />$180 <br />Project <br />Project Engineer <br />Process Engineer/ Controls Engineer ------------------------------------------ <br />$165 <br />Construction Supervisor/Manager---____ ------------------------------------- <br />$140 <br />Autocad Designer/Drafter ---------------------------------------------------- <br />$115 <br />Field Technician$145 <br />------------------------------------------------------------- <br />Admin <br />General Terms <br />1. Travel costs, expenses (fees) and Sub consultant costs will be billed at cost. <br />2. All costs are in United States Dollar. <br />3. All invoices are due within 30 days of issuing the invoice. <br />BIOGAS ENGINEERING 7 www.blogaseng.com +1 (562.) 786-56.56 <br />