SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State <br />of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Guettler Brothers Construction. LLC <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The Project entails re -nourishment of the southern portion of the County's Sector 3 <br />Beach & Dune Restoration Project via placement of about 280.000 cubic yards of <br />beach -compatible sand fill and about 302.820 native dune plants over 2,2 miles of <br />Atlantic Ocean beach in central Indian River County. Sand fill is proposed to be <br />obtained from either (a) the County's Offshore Borrow Area, or (b) an upland sand <br />source pre -qualified by the County, and/or (c) an upland sand source separately <br />approved by Florida Department of Environment Protection. To avoid adverse <br />impacts to nesting sea turtles, construction is expected to be completed during the <br />period from November 1, 2021 and April 30, 2022. <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SECTOR 3 BEACH AND DUNE RESTORATION PROJECT - PHASE 2 <br />County Project Number: IRC -2109 <br />FM Number: N/A <br />Bid Number: 2021050 <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of theContract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />