My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-168
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 11:09:09 AM
Creation date
11/12/2021 1:18:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2021
Control Number
2021-168
Agenda Item Number
8.B.
Entity Name
Divosta Homes, L.P. (Lakes at Waterway Village PD - Pod U )
Subject
Modification to contract for construction for Final Lift of Asphalt
Two (2) year extension until November 27, 2023
Contract # PD-16-12-07-FLA (2004010124-83766)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakes at Waterway Village Plat Pod U <br />STATE OF FLORIDA <br />INDIAN RIVER COUNTY <br />THIS 18 T ERTIFY THAT THIS 18 A TRUE AND CORRECT <br />COPY E ORIGINAL ON FI THIS OFfXE. <br />A, JEFFf*Y R. F, ITH CLERK// i <br />FINAL LIFT BOND - OPC 9/15/2021 <br />TOTALS $ 47,879.16 <br />PROPOSED BOND AMOUNT (125%) $ 59,848.95 <br />��11111111//, <br />Kimley Horn and Nil(ARR/s <br />P.•'•LICE ''• �/ �� <br />NSF •'•S9 <br />No. <br />75481 -e- <br />0(/IS/,Z( <br />IRC ENGINEERING <br />DIVISIDN <br />Accepted <br />insufficient___ <br />Kinan Husgjr `� P.E. yr <br />FL Reg #7548 <br />-C� •. STgT� <br />Kim�� o. <br />N <br />'//,� /ALE \\\` <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />PAVING <br />DESCRIPTION <br />QUANTITY UNIT <br />UNIT COST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods-S-� <br />3,822 SY <br />$ 9.78 <br />$ <br />37,379.16 <br />SIGNING AND STRIPING <br />1 LS <br />$ 2,500.00 <br />$ <br />2,500.00 <br />SET PRM'S, PCP's, LOT CORNERS <br />1 LS <br />$ 8,000.00 <br />$ <br />8,000.00 <br />TOTAL <br />1 $ <br />47,879.16 <br />TOTALS $ 47,879.16 <br />PROPOSED BOND AMOUNT (125%) $ 59,848.95 <br />��11111111//, <br />Kimley Horn and Nil(ARR/s <br />P.•'•LICE ''• �/ �� <br />NSF •'•S9 <br />No. <br />75481 -e- <br />0(/IS/,Z( <br />IRC ENGINEERING <br />DIVISIDN <br />Accepted <br />insufficient___ <br />Kinan Husgjr `� P.E. yr <br />FL Reg #7548 <br />-C� •. STgT� <br />Kim�� o. <br />N <br />'//,� /ALE \\\` <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.