Laserfiche WebLink
Lakes at Waterway Village Plat Pod U <br />STATE OF FLORIDA <br />INDIAN RIVER COUNTY <br />THIS 18 T ERTIFY THAT THIS 18 A TRUE AND CORRECT <br />COPY E ORIGINAL ON FI THIS OFfXE. <br />A, JEFFf*Y R. F, ITH CLERK// i <br />FINAL LIFT BOND - OPC 9/15/2021 <br />TOTALS $ 47,879.16 <br />PROPOSED BOND AMOUNT (125%) $ 59,848.95 <br />��11111111//, <br />Kimley Horn and Nil(ARR/s <br />P.•'•LICE ''• �/ �� <br />NSF •'•S9 <br />No. <br />75481 -e- <br />0(/IS/,Z( <br />IRC ENGINEERING <br />DIVISIDN <br />Accepted <br />insufficient___ <br />Kinan Husgjr `� P.E. yr <br />FL Reg #7548 <br />-C� •. STgT� <br />Kim�� o. <br />N <br />'//,� /ALE \\\` <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />PAVING <br />DESCRIPTION <br />QUANTITY UNIT <br />UNIT COST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods-S-� <br />3,822 SY <br />$ 9.78 <br />$ <br />37,379.16 <br />SIGNING AND STRIPING <br />1 LS <br />$ 2,500.00 <br />$ <br />2,500.00 <br />SET PRM'S, PCP's, LOT CORNERS <br />1 LS <br />$ 8,000.00 <br />$ <br />8,000.00 <br />TOTAL <br />1 $ <br />47,879.16 <br />TOTALS $ 47,879.16 <br />PROPOSED BOND AMOUNT (125%) $ 59,848.95 <br />��11111111//, <br />Kimley Horn and Nil(ARR/s <br />P.•'•LICE ''• �/ �� <br />NSF •'•S9 <br />No. <br />75481 -e- <br />0(/IS/,Z( <br />IRC ENGINEERING <br />DIVISIDN <br />Accepted <br />insufficient___ <br />Kinan Husgjr `� P.E. yr <br />FL Reg #7548 <br />-C� •. STgT� <br />Kim�� o. <br />N <br />'//,� /ALE \\\` <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />