My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-171
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 10:39:55 AM
Creation date
11/12/2021 2:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2021
Control Number
2021-171
Agenda Item Number
8.G.
Entity Name
Jackie Robinson Training Complex
Subject
Villas Remodel - Contract Documents and Specifications
Project Number
IRC 1914A
Bid Number
2022009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: JACKIE ROBINSON TRAINING COMPLEX — VILLAS REMODEL <br />Project No.: IRC -1914A <br />Project Description: Project consists of interior renovations to 57 existing hotel -style <br />rooms located at Jackie Robinson Training Complex. These renovations include the <br />removal and replacement of floor coverings, patching and selected replacement of dry wall <br />ceilings, removal of popcorn ceilings, the removal and replacement of front windows, <br />HEPA vacuum and clean all surfaces to rid space of mold. Project is also to include the <br />removal of existing HVAC duct work above the ceiling, and installation of new insulated, <br />fire rated attic access panels. <br />OWNER's Bid No. 2022009 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />OWNER <br />And To: <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR <br />to complete all the Work in accordance with the Contract Documents. The items in the tentative <br />list shall be completed or corrected by CONTRACTOR within 30 calendar days of the above date <br />of Substantial Completion. <br />Certificate of Substantial Completion REV 04-07 - 00630 - 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1914A - Jackie Robinson Training Center -Villas Remodel\1-Admin\Bids0d Documents\Bid Docs - Villas\Master <br />
The URL can be used to link to this page
Your browser does not support the video tag.