My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-171
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 10:39:55 AM
Creation date
11/12/2021 2:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2021
Control Number
2021-171
Agenda Item Number
8.G.
Entity Name
Jackie Robinson Training Complex
Subject
Villas Remodel - Contract Documents and Specifications
Project Number
IRC 1914A
Bid Number
2022009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1914A <br />qualifications will result in the response being deemed non-responsive and eliminated from <br />consideration. <br />ARTICLE 20 - CONTRACT SECURITY AND INSURANCE <br />20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, <br />sets forth OWNER's requirements as to Public Construction Bond and insurance. When the <br />Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the <br />required insurance certificate(s) and Bond, unless the Bond has been waived due to the total <br />contract being less than $100,000. <br />ARTICLE 21 - SIGNING OF AGREEMENT <br />21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied <br />by the required number of unsigned counterparts of the Agreement with the other Contract <br />Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days <br />thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the <br />Agreement and attached documents to OWNER. <br />21.02 OWNER shall return one fully signed counterpart to Successful Bidder. <br />21.03 Should Bidder to whom the Contract has been awarded refuse or fail to complete the <br />requirements of Article 21.01 above, the additional time in calendar days, required to correctly <br />complete the documents will be deducted, in equal amount, from the Contract time. Or, the <br />OWNER may elect to revoke the Award and the OWNER shall hold the Bid Bond for <br />consequential damages incurred, and the Contract may be awarded as the OWNER desires. <br />* * END OF SECTION * * <br />Instructions to Bidders - 00200 - 11 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1914A -Jackie Robinson Training Center -Villas Remodel\1-Admin\Bids\Bid Documents\Bid Docs <br />
The URL can be used to link to this page
Your browser does not support the video tag.