Laserfiche WebLink
* ADDENDUM #3 9-23-21 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: JACKIE ROBINSON TRAINING COMPLEX - VILLAS REMODEL <br />PROJECT NO. IRC-19Z4A BID NO. <br />BIDDER'S NAME <br />Item No:. <br />Description'; ;. :';` <br />Unit <br />Unit Price <br />Quantity <br />Amount <br />MOBILIZATION - FOR CONTRACTS OF 120 CONTRACT <br />DAYS DURATION OR LESS, PARTIAL PAYMENT WILL BE <br />MADE AT 50% OF THE BID PRICE PER MONTH FOR THE <br />FIRST TWO MONTHS. FOR CONTRACTS IN EXCESS OF <br />120 CONTRACT DAYS DURATION, PARTIAL PAYMENT <br />WILL BE MADE AT 25% OF THE BID PRICE PER MONTH <br />FOR THE FIRST FOUR MONTHS. IN NO EVENT SHALL <br />MORE THAN 50% OF THE BID PRICE BE PAID PRIOR TO <br />1 <br />COMMENCING CONSTRUCTION ON THE PROJECT SITE <br />LS <br />1 <br />0 c <br />2 <br />PUBLIC CONSTRUCTION BOND <br />LS <br />1 <br />REMOVE CLEAN, AND REINSTALL EXISTING FURNITURE, <br />3 <br />PROVIDE STORAGE AS NECESSARY <br />LS <br />, <br />325 SF VILLA ROOM REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA, FURNISH AND <br />INSTALL LVT FLOORING, REMOVE AND REPLACE ANY <br />MOLD OR WATER DAMAGED DRYWALL CEILINGS AND <br />4 <br />WALLS, AS INDICATED ON PLANS, PAINTING OF ALLt� <br />WALLS, AND TEXTURING OF MAIN AREA CEILING <br />�• d <br />� V -- D <br />EA <br />2 <br />400 SF VILLA ROOM REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA, FURNISH AND <br />INSTALL LVT FLOORING, CUT EXISTING BULKLHEADS <br />DOWN TO 8" BELOW CEILING, REMOVE AND REPLACE <br />ANY MOLD OR WATER DAMAGED DRYWALL CEILINGS <br />AND WALLS, AS INDICATED ON PLANS, PAINTING OF ALL <br />5 <br />WALLS, AND TEXTURING OF MAIN AREA CEILING <br />EA� <br />i O• <br />48 <br />'Z <br />620 SF VILLA SUITE REMODEL - WORK INCLUDES <br />CLEANING OF ALL HARD SURFACES, REMOVAL OF <br />CARPET AND TILE IN LIVING AREA AND BEDROOM, <br />FURNISH AND INSTALL LVT FLOORING, CUT EXISTING <br />BULKLHEADS DOWN TO 8" BELOW CEILING, REMOVE <br />AND REPLACE ANY MOLD OR WATER DAMAGED <br />DRYWALL CEILINGS AND WALLS, AS INDICATED ON <br />6 <br />PLANS, PAINTING OF ALL WALLS, AND TEXTURING OF <br />MAIN LIVING AREAAND BEDROOM CEILING <br />EA <br />` 2%•� <br />7 <br />7CO� t • �� <br />7 <br />WINDOWS 6'-2" X 4'-0" <br />EA <br />�g <br />90 <br />"p 0 <br />8 <br />EXHAUST FAN <br />EA <br />// <br />6 <br />52 <br />9 <br />EXTERIOR DOOR WEATHER STRIPPING <br />EA <br />%j�' <br />57 <br />10 <br />REPAIR CRACKED AND SPALLED STUCCO AT DOOR <br />THRESHOLDS <br />EA <br />13 •� <br />20 <br />REPAIR RUSTESTED TAPCON SCREWS IN EXTERIOR <br />11 <br />DOOR FRAMES-7PR <br />O <br />50 <br />pLv '—fl • �� <br />REPLACE RUSTED FASTENERS AT DOOR CLOSERS <br />12 <br />WITH STAINLESS STEEL HARDWARE <br />EA <br />O <br />10 <br />z, C) <br />13 <br />INSULATION BAFFLES <br />EA <br />4_11 <br />667 <br />0D <br />14 <br />SOFFIT VENTS <br />EA <br />�' �`� <br />667 <br />( / <br />T' '-'Ob ' <br />003103 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1g14A Jeck,e Robinson Training Center - Villas Remodel\1 Admin\Blds\Bid Documents\Bid Docs Villas\Add-WW.- <br />