My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-171
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 10:39:55 AM
Creation date
11/12/2021 2:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2021
Control Number
2021-171
Agenda Item Number
8.G.
Entity Name
Jackie Robinson Training Complex
Subject
Villas Remodel - Contract Documents and Specifications
Project Number
IRC 1914A
Bid Number
2022009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. Department of Labor , inspection Number: 1512888 <br />Occupational Safety and Health Administration Inspection Date(s): 02/02/2021 - 02/02/2021 <br />Issuance Date: 04/09/2021 <br />Citation incl Notification of Penalty <br />Company Name: Gibraltar Construction Company, Inc. <br />Inspection Site: 10750 Ulmerton Rd, Pinellas County Sheriffs Office, Largo, FL 33778 <br />Citation 1 Item 1 Type of Violation: Serious <br />29 CFR 1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent <br />person before each work shift, and after any occun-ence which could affect a scaffold's structural integrity: <br />a. On or about 2/2/2021, near the entrance of the Sheriffs office, two employees were directed to secure tarps <br />that were acting as a wind -debris barrier along a walkway that was enclosed by scaffolding. The scaffolding had <br />not been inspected by a competent person before the start of the workday and the scaffold did not have <br />guardrails installed or a safe means of access, thus exposing the employee to a 1 1 foot fall hazard. <br />Date By Which Violation Must be Abated: <br />Proposed Penalty: <br />Corrected During Inspection <br />$6,827.00 <br />See pages 1 tltrcuah 4 of this Citation and Notification of Penalty for information on enploycr and c mployce rights and responsibilities <br />Citation and Notification of Penalty Page 6 OSHA <br />
The URL can be used to link to this page
Your browser does not support the video tag.