Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State <br />of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Gibraltar Construction Company, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Project consists of interior renovations to 57 existing hotel -style rooms located at <br />Jackie Robinson Training Complex. These renovations include the removal and <br />replacement of floor coverings, patching and selected replacement of dry wall ceilings, <br />removal of popcorn ceilings, the removal and replacement of front windows, HEPA vacuum <br />and clean all surfaces to rid space of mold. Project is also to include the removal of existing <br />HVAC duct work above the ceiling, and installation of new insulated, fire rated attic access <br />panels. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: JACKIE ROBINSON TRAINING COMPLEX — VILLAS <br />REMODEL <br />County Project Number: IRC -1914A <br />Bid Number: 2022009 <br />Project Address: 3901 26th St. Vero Beach, FL. 32960 <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative,*assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1914A - Jackie Robinson Training Center - Villas Remodel\1-Admin\Bids\Bid Documents\Bid Docs - Villas\Master <br />Contract Documents\DIV 0_3_Contract Forms-20210223.docx <br />