My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-189
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 5:08:30 PM
Creation date
12/16/2021 11:44:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/16/2021
Control Number
2021-189
Agenda Item Number
8.A.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 46 for 69th Street Utility Improvement Project
12" water main extension
Area
69th Street between 58th Avenue to 650’ west of 39th Court
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER 46 <br />69" STREET UTILITY IMPROVEMENT PROJECT <br />This Work Order Number 46 is entered into as of this 16 day of Novembez 2021, pursuant to <br />that certain Continuing Contract Agreement for Continuing Engineering Services, dated April 17, <br />2018, renewed and amended as of May 18, 2021 (collectively referred to as the "Agreement"), by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and <br />KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The <br />professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B <br />(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The <br />Consultant will perform the professional services within the timeframe more particularly set forth in <br />Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in <br />accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of <br />the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement <br />and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as <br />if fully set forth herein. <br />EXHIBIT A— SCOPE OF WORK <br />69TH Street Utilitv Improvement Proiect — 58th Avenue to 650' west of 39th Court <br />The County desires to complete the installation of a 12" water main along 69th Street between <br />58th Avenue to 650' west of 3911 Court, approximately 5,900 linear feet. This will enable a <br />looped water main connection between 58th Avenue and Old Dixie Highway providing for a <br />more resilient potable water distribution system. <br />The County desires that these improvements to be concurrently bid with the County's planned <br />69th Street Resurfacing Project that is tentatively scheduled to be advertised for bidding first <br />quarter 2022. <br />A. Utility Plans: <br />The following is the anticipated utility improvement associated within the project limits: <br />1. The utility plan sheets will be drawn at a scale of 1" = 100' prepared on 11" x 17" sheets. <br />2. All quantities shall reference FDOT Pay Item Numbers. <br />3. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction and/ or Indian River County Utility Standards. Any deviations or special <br />specifications not included in specifications will be provided in the Technical <br />Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.