Laserfiche WebLink
TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately three (3) months from the Notice to Proceed (NTP). <br />NTP <br />contingent upon BOCC approval <br />Constructability Submittal (60% Design Drawings) <br />Biddability Submittal (90% Design Drawings) <br />Permit Submittal <br />Production Submittal (100% Design Drawings) <br />1 months following NTP <br />2 months following NTP <br />2 months following NTP <br />3 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />