My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-200
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:36:41 PM
Creation date
12/17/2021 2:05:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/07/2021
Control Number
2021-200
Agenda Item Number
8.V.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 48, 43rd Avenue & South Relief Canal
18” Water Main Relocation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately four (4) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Preliminary Submittal (30% Design Drawings) 1 months following NTP <br />Constructability Submittal (60% Design Drawings) 2 months following NTP <br />Biddability Submittal (90% Design Drawings) 3 months following NTP <br />Permit Submittal 3 months following NTP <br />Production Submittal (100% Design Drawings) 4 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.