My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-202
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:34:13 PM
Creation date
12/17/2021 2:42:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/07/2021
Control Number
2021-202
Agenda Item Number
8.Z.
Entity Name
Ardaman & Associates, Inc.
Subject
Renewal and Amendment No. 1 to Continuing Contract Agreement for Continuing
Geotechnical Engineering Services RFQ2018042
Bid Number
IRC-1812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SlOr7 Ardaman & Associates, Inc. <br />Geotechnical, Environmental and <br />Materials Consultants <br />REVISED EXHIBIT "1" <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />460 NW Concourse Place, Unit 1 <br />Port St. Lucie, Florida 34986 <br />772-878-0072 (office) <br />772-878-0097 (fax) <br />www.ardaman.com <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 12/4/21 through 12/3/23) <br />SPECIAL DRILLING/SOUNDING <br />Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NO wire line coring; large diameter borings; <br />drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter temporary <br />casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project. <br />OTHER DRILL RIG CHARGES <br />Clearing Difficult Access, Hole Location and Set-Up........................................................................................$270.00/hour <br />StandbyTime (drillers).....................................................................................................................................$270.00/hour <br />Piezometer and Well Installation (plus materials).............................................................................................$270.00/hour <br />Bore Hole Grouting and Sealing (plus materials).............................................................................................$270.00/hour <br />Materials. : ... ...... ...... *"*** ....... ............ ' '" ' Cost + 15% <br />Barge Borings........................................................................................................................Normal drilling rates times 1.5 <br />ATV Borings...........................................................................................................................Normal drilling rates times 1.5 <br />INSTRUMENTATION <br />Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and <br />packer tests will be determined per project. <br />GENERAL FIELD EQUIPMENT: <br />Generator..................................................................................................... ......... $105.00/day <br />............................................ <br />SteamCleaner.................................................................................................................................................. $105.00/day <br />Surveying Equipment (Water Table Elevations).................................................................................................. $70.00/day <br />PeristalticPurging Pump..................................................................................................................................... $54.00/day <br />pH/Conductivity Meter.........................................................................................................................................$36.00/day <br />TurbidityMeter.................................................................................................................................................... $58.00/day <br />WaterLevel Indicator.......................................................................................................................................... $26.00/day <br />EXPENDABLE SUPPLIES: <br />High Capacity (0.45 micron) Filter..................................................................................................................... <br />$26.00/each <br />Disposable Teflon Bailer................................................................................................................................... <br />$21.00/each <br />Disposable Polyethylene Bailer......................................................................................................................... <br />$16.00/each <br />Isopropyl Alcohol (decontamination)................................................................................................................ <br />$16.00/gallon <br />Deionized Water (decontamination).................................................................................................................. <br />$5.30/gallon <br />16 oz. Soil Jars (soil headspace analysis)...........................................................................................................$16.00/box <br />TygonTubing.................................................................................................................................................$3.75/foot <br />PolyethyleneTubing................................................................................................................................................ <br />$.90/foot <br />55 -gallon Drum..................................................................................................................................................$80.00/drum <br />HEAVY EQUIPMENT: <br />Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc .......................................................... Cost + 15% <br />ENVIRONMENTAL SITE ASSESSMENTS <br />Phase I Environmental Site Assessments <br />Tracts 50 acres or less (contiguous properties or per individual tract) ................................................... $2,000.00 Minimum <br />Tracts between 51 and 500 acres (contiguous properties).................................................................... $2,400.00 Minimum <br />Tracts greater than 500 acres.....................................................................................................................varies by project <br />Phase II Environmental Site Assessments..................................................................................................varies by project <br />Analytical Laboratory testing for hazardous or petroleum contamination <br />(soil, sediment and groundwater)........................................................................................................................ cost + 15% <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.