My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-203
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 2:33:55 PM
Creation date
12/17/2021 2:54:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/07/2021
Control Number
2021-203
Agenda Item Number
8.Z.
Entity Name
GFA International, Inc.
Subject
Renewal and Amendment No. 1 to Continuing Contract Agreement for Continuing
Geotechnical Engineering Services RFQ2018042
Bid Number
IRC-1812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Sampling. <br />Installation of piezometers and observation wells; 2" Diarn PVC (0 to 50 feet) .................$35.00/Foot <br />Permanent Groundwater Monitoring Wells of polluted soil and groundwater (2" Diam PVC) <br />From sutface to depts. Of 50 feet tan nn /Eel t <br />Protective well covers. tads and manholes .......................... Vso M/WPIi <br />Subsurface Permeability, Tests: <br />SFWMDExfiltradon test ..................... ...... ........................................................ ........................ $400.00/test <br />BoreholePermeability test ............. ......... .......................................................... ......................... $400.00/test <br />Double Ring Infiltrometer test......................................_............................................................$500.00/test <br />• ENGINEERING SERVICES • <br />Inspection of construction procedures, data evaluation, engineering analyses, and report preparation <br />Principal Engineer(P.E.)..............................»............................................................................... $175.00/hr. <br />Senior Project Engineer(P.K)............................................................................................. ... $150.00/hr. <br />ProjectManager.............................................................................................................................. $130.00/hr. <br />ProjectEngineer (P.R.).................................................................................................................. $110.00/hr. <br />Senior Roadway Field Technician.................................................................................................. $80.00/hr. <br />EngineeringTechnician.................................................................................................................. $63.00/hr. <br />Administrative Personnel (Cadd/Admin Assistant) .............................. ................$50.00/hr. <br />Hourly Rate is to include all reimbursable expenses, including travel, meals, copies, <br />deliverables and so forth. Hourly rate is to be calculated as time on the job only, no travel <br />time shall be included or paid. Overtime is 1.5 times the hourly rates provided <br />02018 GFA Internatlonal, Inc. All Rights Reserved. <br />Page 5 of e <br />
The URL can be used to link to this page
Your browser does not support the video tag.