Laserfiche WebLink
KAST <br />CONSTRUCTION <br />KAST Construction Company, LLC <br />701 Northpoint Pkwy, Suite 400 <br />West Palm Beach, Florida 33407 <br />Phone: (561) 689-2910 <br />PCO #051 <br />Project: 20-002-01 - FPL - Indian River Service Cen <br />1575 98th Avenue <br />Vero Beach, Florida 32966 <br />Prime Contract Potential Change Order #051: ASI -016 Float ON Drainage <br />TO: FLORIDA POWER & LIGHT FROM: KAST CONSTRUCTION <br />ATTN: PPC/GO RM 2420 9250 W FLAGLER 701 Northpoint Pkwy, Suite 400 <br />STREET West Palm Beach Florida, 33407 <br />MIAMI Florida, 33174 <br />PCO NUMBERIREVISION: 051 /0 CONTRACT: 1 - FPL - Indian River Service Cen Prime <br />Contract <br />REQUEST RECEIVED FROM: Jack McGowan (CBRE/Global Workplace CREATED BY: James Lent (KAST CONSTRUCTION) <br />Solutions - FPL) <br />STATUS: Approved CREATED DATE: 2/22/2021 <br />REFERENCE: <br />FIELD CHANGE: No <br />LOCATION: Site>98th Ave <br />PRIME CONTRACT None <br />CHANGE ORDER: <br />ACCOUNTING <br />METHOD: <br />Amount Based <br />SCHEDULE IMPACT: 0 days TOTAL AMOUNT: $10,800.63 <br />POTENTIAL CHANGE ORDER TITLE: ASI -016 Float ON Drainage <br />CHANGE REASON: Client Request <br />POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) <br />CE #082 - ASI -016 Float ON Drainage <br />"Cut / demo newly installed 1 st lift of asphalt/base Rock installed as proposed on sheet 14 of the 98th Ave & 16th St Service Center plans for installation <br />of new pipe and restore asphalt profile to the driveway apron configuration provided per plan". <br />ATTACHMENTS: <br />IRCSS CO proposal 23 rev.pdf Float On N Driveway Rev.odf <br /># <br />Cost Code Description <br />Type <br />Amount <br />1 <br />02-300 - EARTHWORK ASI -016 Float On Drainage <br />SUBCONTRACTOR <br />$ 10,150.00 <br />Subtotal: <br />$10,150.00 <br />GL Insurance : 1.07% Applies to all line item types. <br />$ 108.61 <br />Builder's Risk: 0.27% Applies to all line item types. <br />$2 . <br />Fee: 5.00% Applies to all line item types. <br />$ 514.32 <br />Grand Total: <br />$10,800.63 <br />This proposal expires after calendar days and is subject to review and possible adjustment of Cost and Time thereafter. The Contract Time will be <br />unchanged at this time, however this change impacts the Construction Schedule by calendar days for completion of this area, and at this time does <br />not by itself, affect the critical path or Substantial Completion date, so long as approval of this pricing is received prior to the expiration date. Due to the <br />late receipt of this change and the aggregate impact of additional changes that may cause a delay to project completion, the Contractor reserves the <br />right to request additional Contract Time. <br />KAST Construction Company, LLC page 1 of 2 Printed On: 3/1/ 2021 04 :05 PM <br />