My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/12/2021
CBCC
>
Meetings
>
2020's
>
2021
>
10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2022 10:16:29 AM
Creation date
12/29/2021 10:38:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/12/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AffNTIC <br />0F ING 11 <br />OF VERO EiEACH, Imc. <br />4310 45th Street, Vero Beach, FL 32967 <br />PROPOSAL AND CONTRACT <br />(jok" <br />P: 772-492-8493 <br />F: 772-257-5740 <br />www.atianticroofing2.com <br />License No. CCC1326188 <br />Submitted To:. <br />Summerlin's Marine construction <br />Project: <br />Wabasso Scrub. <br />Address: <br />200 Naco Rd, FL 34946 <br />Address: <br />City: <br />Ft. Pierce, FL 34946 <br />City: <br />Phone: <br />772-464-7470 <br />Phone: <br />Attn.: <br />I Joy Yancy <br />Email: <br />I Summerlinsmarineconstruction@gmail.com <br />Atlantic Roofing 11 of Vero Beach, Inc. agrees to furnish all labor, materials and equipment as necessary to complete the scope <br />of work as described below subject to the terms and conditions contained herein. <br />1. Install one layer of peel and stick undedayment over existing roof deck, install 26 gauge metal drip - <br />edge at perimeter of roof, then install a 26 gauge 5-V crimp metal roof over underlaymet with new <br />hip and ridge caps. <br />Quote is good for up to 200 sq ft of roof area. <br />With the consent of the Buyer, any rotten lumber or unsuitable substrate materials which are disclosed as the work progresses, <br />and which are not specifically mentioned in this proposal and agreement, will be replaced or made suitable, and any additional <br />costs.will be added to the contract. Wood replacement is an additional cost and will be written up as a Change Order. This <br />work to be completed for the sum of - <br />TOTAL <br />DEPOSIT: <br />AFTER DRY -IN: <br />DUE UPON MATERIAL DELIVERY. <br />DUE UPON COMPLETION: <br />$ 5,625 <br />Offer is valid 30 days from issuance and on contingency of approval of insurance, if filing a claim. Atlantic Roofing 11 of Vero <br />Beach, Inc. representative will meet insurance adjuster on the day of inspection. Please call 772-492-8493 as soon as you have a date <br />and time that the adjuster is scheduled to be on the job site. <br />Submitted by: ��iL Date: 8/1/21 <br />e <br />ACCEPTANCE OF PROPOSAL <br />The above specifications, prices, and conditions are satisfactory and hereby accepted. Atlantic Roofing 11 of Vero Beach, Inc. is <br />authorized to do the work as specified. Please read and sign the ,proposal below: <br />Accepted by: 0.V Date: <br />v <br />Customer Signa ure <br />Printed Name: <br />�— 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.