My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-208
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 2:09:15 PM
Creation date
12/29/2021 2:07:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/14/2021
Control Number
2021-208
Agenda Item Number
8.J.
Entity Name
Sentinel Technologies, Inc.
Subject
Agreement for DMZ Modernization to upgrade the County’s current
computing environment & supporting network infrastructure
Area
1800 27th Street
Bid Number
2022012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents. <br />CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />J. Contractor is registered with and will use the Department of Homeland Security's E -Verify system <br />(www.e-verify.gov) to confirm the employment eligibility of all newly hired employees for the <br />duration of this agreement, as required by Section 448.095, F.S. Contractor is also responsible for <br />obtaining proof of E -Verify registration and utilization for all subcontractors. <br />K. Contractor is actively registered in the System for Award Management (SAM). <br />ARTICLE 8 - CONTRACT DOCUMENTS <br />8.01 Contents <br />A. The Contract Documents consist of the following: <br />(1) This Agreement; <br />(2) Notice to Proceed; <br />(3) Public Construction Bond; <br />(4) Certificate(s) of Liability Insurance; <br />(5) Invitation to Bid 2022012; <br />(6) Addenda (numbers 1 to 4, inclusive); <br />(7) CONTRACTOR'S Bid Form; <br />
The URL can be used to link to this page
Your browser does not support the video tag.