My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-210
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 2:59:29 PM
Creation date
12/29/2021 2:59:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/14/2021
Control Number
2021-210
Agenda Item Number
8.O.
Entity Name
Tetra Tech Inc.
Subject
CCNA2018 Work Order 10 Lagoon Plan
for Indian River Lagoon Management Plan Development Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Eric Charest <br />November 1, 2021 <br />Page 2 of 4 <br />will assist with the review of the data gaps for IRC to determine potential projects to achieve the <br />required load reductions. Tetra Tech will also meet with IRC staff and officials from various <br />departments to determine what other specific goals and visions are intended for the IRL <br />Management Plan and compile a list of projects that are already planned or identified within the <br />IRL Basin. Tetra Tech will also compile available economic evaluations for the IRL Basin, <br />which will be used to determine the economic benefit of an improved IRL specifically for IRC. <br />Tetra Tech will use this information to develop an outline of the IRL Management Plan and an <br />initial vision for a cohesive plan that outlines the potential water quality projects and <br />management actions for the protection and restoration of the IRL in IRC. <br />PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best <br />estimates of time required to perform the basic services and may be subject to change upon <br />agreement between IRC and Tetra Tech. <br />Task Timeline <br />Notice to Proceed TP November 1, 2021 <br />Draft IRL Manage ent Plan July 2022 <br />ASSUMPTIONS <br />Tetra Tech's scope of services and project costs were developed with the following assumptions: <br />• Tetra Tech will review available data provided by IRC. No field sampling or analysis will <br />be conducted by Tetra Tech. <br />• Tetra Tech staff will be compiling the project information provided by IRC. Tetra Tech <br />will assist in identifying projects; however, design services are not included in this <br />proposal. <br />• IRC's IRL Plan Environmental Specialist will lead the effort to coordinate with IRC <br />departments to gather information on existing projects, planned projects, priorities, and <br />other necessary details for the plan. <br />• Additional restrictions or limitations as a result of COVID-19, weather, or other <br />unforeseen circumstances will not inhibit Tetra Techs level of effort or schedule. <br />PROJECT COST <br />The estimated costs are based on our current understanding of the project requirements and best <br />estimates of level of effort required to perform the basic services and may be subject to change <br />upon agreement between IRC and Tetra Tech. Our Time and Materials price proposal includes <br />labor hours and travel costs in the amount of $40,576.00, as outlined in Table 1. <br />Tetra Tech will invoice IRC each month for services rendered during the previous calendar <br />month based on work completed for each task. Tetra Tech shall be paid for all invoices within 30 <br />days of an approved submittal. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.