Laserfiche WebLink
APPENDIX C — PART 2: REVISED DOR <br />Division of Responsibilities <br />Scope of Work Description <br />Company <br />District <br />Concentrator & Flare, Hot Gas Transfer Equipment HGTE - Des' n & Fabrication <br />X <br />Infeed Tank <br />X <br />Infeed Pum s <br />X <br />Processed Residual Tank(s)- Design & Supply <br />X <br />Concentrator & Flare, HGTE, Processed Residual Tank(s)- Transportation to Site, CIP per Incoterms 2010 <br />X <br />Landfill Gas(LFG) and Nat Gas su plyfor thermal energy, LFG Blower and Controls (if needed)- Supply and Installation <br />(a) & (b) <br />X <br />Wastewater Storage Tank(s), Wastewater Supply Pump(s), Electrical & Utilities Connection <br />(a) & (c) <br />X <br />Infeed Wastewater <br />X <br />Chemical Storage Tanks <br />(a) <br />X <br />Site Works: Site Preparation (Earthworks, Foundations, Containment) <br />(b) <br />X <br />Containment Sump and Sump Pump <br />(b) <br />X <br />Project Management and Detailed Engineering <br />X <br />Concentrator System- Installation, Mechanical & Electrical Site Works <br />X <br />Crane/Manlift Rental for Equipment Unloading & Installation <br />X <br />Heat Trace & Insulation as needed) <br />X <br />Other miscellaneous site M&E interconnecting materials <br />(e) <br />X <br />X <br />On-site Technical Advisory Support during equipment installation critical milestones <br />X <br />Remote monitoring and control system <br />X <br />Utility Su LFG! Nat Gas, Electricity, Service Water <br />(a) <br />X <br />Processed Residual Tank(s) & Disposal <br />(b) <br />X <br />Permitting, Emissions Monitoring <br />X <br />Site Safety Equipment <br />X <br />Concentrator System Commissioning & Start-up <br />X <br />Day-tD-Day Operation and Maintenance of Concentrator System, Including Consumables <br />(d) <br />X <br />Other Miscellaneous Items <br />e) <br />X <br />X <br />(a) Major items includes mainly. Residual management and disposal, chemical storage tanks, utility supply, routing of Landfill Gas (LFG) and Nat Gas to Company flare at <br />required pressure and flow, including modifications to LFG blowers, controls,... etc. <br />(b) Company will provide the Residual Tank(s) as part of its scope of work. Earthworks, foundation, secondary containment, containment sump and sump pump; During <br />operation, Developer will notify IRC SWDD when Residual Tank(s) must be emptied, and IRC SWDD via its on-site logistics partners will transport the Processed Residual <br />to the top of landfill and dispose in landfill. <br />(c) The point of connection is the Concentrator skid; electrical includes 480VAC service. <br />(d) Developer plans to have 1-2 fully trained site engineers at site full-time. Consumables include antifoam, CIP, lubricant, etc. <br />(e) Such as site engineering services, permitting, Processed Residual disposal, construction tools, power & consumables, equipment rentals, etc. <br />Page 4 of 4 <br />