My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1962-056
CBCC
>
Resolutions
>
1960's
>
1962
>
1962-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 1:24:48 PM
Creation date
1/6/2022 3:42:44 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1962-056
Approved Date
10/01/1962
Resolution Type
Contract for Addition to County Jail
Entity Name
Netto Construction
Subject
Contract for Addition to County Jail
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />I! September 14, 1962 <br />TO: General Contractors <br />FROM: Nelson A. Faerber, A,1,A. <br />HE: Indian River County Sheriff's Dept. & Jail <br />Vero Beach, Florida <br />SUBJ: Addendum #3 to Plans and Specifications <br />I <br />I Item #l: (a) <br />The fire hose and reel, as indicated on drawings, <br />shall be specified as Hose Reel Unit #2210 as <br />manufactured by the Standard Fire Hose Company, <br />Santa Monica, California, and distributed by <br />Norman Ascher and Associates, 46 N.E. 6th St., <br />Miami, Florida, <br />(b) <br />11" fire line as specified shall be separate <br />from other plumbing and connect directly to <br />water main at entrance to building. <br />Item #2: Specifications for tile work shall be modified <br />as follows: <br />(a) Tile Wainscot at toilet shall be 4'0" with <br />the base in lieu of quarry as specified. <br />(b) One round column at Administration area <br />shall be tile finished. <br />Item #3: Flooring shall be homogenous vinyl as per <br />specifications. Finish schedule shall be <br />changed to read homogenous vinyl. <br />Item #4: Revised structural sheet S-1 shall have the <br />following information added to the column schedule: <br />Omit designation for Column Df1-4 <br />Vert.Stl. Ties Footing Size Footing Steel <br />E-4 4#7 #2@12" 415"x415"xl3" 9#4 ea. way <br />D-4 4#7 #2@12" 415"x415"xIX1 9#4 ea, way <br />B-4 4#7 #2012" 415"x415"xI3" 9#,4 ea. way <br />There tieing no further business, on motion made, seconded and <br />,arriied, the Board then adjourned, <br />
The URL can be used to link to this page
Your browser does not support the video tag.