Laserfiche WebLink
TBIs AGMAZOUT made the day of 1N9 <br />by and between Tsi UM COWANT. hereinafter called the Contractor <br />and UWIAN !ITER COON!!, a Political stibdiwisicn of the state Vf <br />Florida, hereinafter called the Owns, <br />1I1lRESMEls. that the Contractor and the Owner for the con- <br />siderations hereinafter named agree So follow: <br />ARTICLE N. sCOPE W THE WORK. <br />The Contractor shall tat I" all of the materials and per- <br />form all of the work shown an the Drawings and described in the <br />Specifications entitled Kitchen Equipment for Indian River County <br />Sheriff Department h Jail, Yero Beach, Florida, prepared by Nelson <br />A. yaerber, AIA, Naples, Florida. acting as and in these Contract <br />Documents entitled the Architect; and shall do everything required <br />by this Agreement, the General Conditions of the Contract, the <br />dpecifications and the Drawings. <br />ARTICLE Z. TIME OP CC1PUMIGN. <br />The work to be performed under this Contract shall be com- <br />menced immediately and shall be substantially completed March 18, <br />1983, and liquidated damages for delay in substantially completing <br />the work shall be as not forth in section 3-90 of the Specifica- <br />tions. <br />ARTICLE 3. THE CONTRACT M. <br />The Owner shall pay the Contractor for the performance of <br />the Contract, subject to additions and deductions provided therein <br />in current funds as follows: Nino Thousand Eight Hundred Ninety- <br />eight Dollars (99,698). <br />ARTICLE 4. PROGRESS PAYMENTS. <br />The Owner shall make payments on account of the Contract <br />as provided therein, a• follow: ; <br />LAW OFFICE JOHN R. COULD VERO BEACH, FLORIDA <br />