My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/02/2021
CBCC
>
Meetings
>
2020's
>
2021
>
11/02/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 12:18:49 PM
Creation date
1/20/2022 12:01:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/02/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Lucie Inlet <br />Table 13: St. Lucie Inlet - Inlet Management Plan and bypass objective. <br />*Bypass objective of 185,000 cy to the souti was initially established in the 2008 SBNIP and then updated in 2016. <br />Table 14: St. Lucie Inlet - Updated IMP bypass summary of sand bypass volumes, since 2016. <br />Bypassing Matrix <br />North Bypass (CY) <br />South Bypass (CY) <br />Annual Bypass <br />Annual Bypass <br />County <br />Inlet <br />Year IMP <br />Objective North <br />Objective South <br />61,200 <br />206,319 <br />Updated <br />136,000 <br />226,593 <br />Percent Objective Met: <br />180.00% <br />128.15% <br />(CY) <br />(CY) <br />Martin <br />St. Lucie <br />1995 <br />0 <br />0 <br />Martin <br />St. Lucie -Updated <br />2016 <br />1 34,000 <br />1 161,000 <br />*Bypass objective of 185,000 cy to the souti was initially established in the 2008 SBNIP and then updated in 2016. <br />Table 14: St. Lucie Inlet - Updated IMP bypass summary of sand bypass volumes, since 2016. <br />Bypassing Matrix <br />North Bypass (CY) <br />South Bypass (CY) <br />*Cumulative Volume Bypassed: <br />306,000 <br />1,031,593 <br />Cumulative Objective: <br />170,000 <br />805,000 <br />Annualized Volume Bypassed: <br />61,200 <br />206,319 <br />*Surplus (Deficit): <br />136,000 <br />226,593 <br />Percent Objective Met: <br />180.00% <br />128.15% <br />*With the updated IN/W in 2016, the account -ng of bypassing and any surplus/deficits pre -2016 are not shown. <br />*The cumulative volume bypassed to the north does not include the beach nourishment volumes listed in the SBMP. <br />120,000 <br />100,000 <br />80,000 <br />a, <br />E <br />0 60,000 <br />N <br />T 40,000 <br />m <br />20,000 <br />0 r <br />St. Lucie Inlet - Bypass Volume North <br />Ln l0 r, 00 m O ci N M V V1 l0 r, 00 M O .-i N M V V1 lD r, 00 M O <br />Q1 O1 Ol Ol Ol O O O O O O O O O O .-i e -i e-1 c -I r -I r -I c -I .--I rH r H N <br />Ol Ol Ol Ol Ol O O O O O O O O O O O O O O O O O O O O O <br />N N N N N N N N N N N N N N N N N <br />Year <br />350,000 <br />250,000 <br />a <br />E <br />200,000 0 <br />150,000 <br />f0 <br />100,000 E <br />3 <br />v <br />50,000 <br />0 <br />� Bypass Volume Annual Objective Cumulative Volume — — — Cumulative Objective <br />Figure 11: St. Lucie Inlet bypass volume, annual objective, cumulative volume and cumulative <br />objective. <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.