My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/02/2021
CBCC
>
Meetings
>
2020's
>
2021
>
11/02/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 12:18:49 PM
Creation date
1/20/2022 12:01:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/02/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Longboat Pass <br />Table 39: Longboat Pass Management Plan and bypass objective. <br />*Bypass objective is from the Strategic Beach Management Plan (2008). <br />Table 40: Longboat Pass bypass summary of sand bypass volumes, since 2008. <br />Bypassing Matrix <br />North Bypass (CY) <br />Year IMP Adopted <br />Annual Bypass <br />Annual Bypass <br />County <br />Inlet <br />or Updated <br />Objective North <br />Objective South <br />0 <br />24,108 <br />Surplus (Deficit): <br />(CY) <br />(CY) <br />Manatee <br />Longboat Pass <br />2008* <br />0 <br />57,800 <br />*Bypass objective is from the Strategic Beach Management Plan (2008). <br />Table 40: Longboat Pass bypass summary of sand bypass volumes, since 2008. <br />Bypassing Matrix <br />North Bypass (CY) <br />South Bypass (CY) <br />Cumulative Volume Bypassed: <br />0 <br />313,400 <br />Cumulative Objective: <br />0 <br />751,400 <br />Annualized Volume Bypassed: <br />0 <br />24,108 <br />Surplus (Deficit): <br />0 <br />-438,000 <br />Percent Objective Met: <br />I N/A <br />41.71% <br />Figure 28: Longboat Pass bypass volume, annual objective, cumulative volume and cumulative <br />objective. <br />120 <br />Longboat Pass - <br />Bypass Volumes South <br />250,000 <br />800,000 <br />700,000 <br />200,000 <br />' <br />600,000 <br />} <br />150,000 <br />500,000 E <br />. <br />' <br />o <br />400,000 a <br />M 100,000 <br />.0s ' <br />300,000 <br />CL <br />m <br />' <br />E <br />' <br />200,000 <br />50,000 <br />' <br />100,000 <br />0 <br />0 <br />2008 2009 <br />2010 2011 2012 20133 <br />2014 2015 2016 2017 2018 2019 2020 <br />Year <br />Bypass Volume <br />Annual Objective <br />Cumulative Volume — — — Cumulative Objective <br />Figure 28: Longboat Pass bypass volume, annual objective, cumulative volume and cumulative <br />objective. <br />120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.