Laserfiche WebLink
BYERS <br />ENGINEERING <br />COMPANY <br />1. OVERVIEW <br />Indian River County Implementation <br />This proposal is Byers response to Indian River County's (IRC) requests for a survey and inventory of your <br />fiber optic facilities and encoding of a final phase, Phase 3, of the IRC network into Byers NexusWorx <br />fiber management system. In 2017 Byers has conducted a field survey and inventory, including splice <br />verification, for a pilot area. This pilot project has refined the data points needing to be captured and <br />populated in NexusWorx and as such is reflected in this proposal. In the Phase 2 proposal the network was <br />divided into two phases, 2 and 3. The Phase 2 implementation is complete with the exception of updating <br />connectivity. This proposal contains the cost and effort for the phase 3 area to complete the ISP and OSP <br />surveys, encoding updates and connectivity updates as captured by Byers and OSP splice verification <br />vendor. <br />As in Phase 2 Byers will not be responsible for the splice verification effort, but IRC will utilize their <br />vendor of choice for this verification. Byers will identify the splice locations as part of our survey and <br />inventory and provide detail list to IRC of these splice locations with fiber cable sizes. We will update the <br />connectivity based on the splice verification data provided from the splice verification vendor and <br />connectivity data from the ISP inventory. <br />Byers pricing is based on the task and scope as defined within this document and estimated units as <br />outlined below. <br />Unit Number <br />Aerial Route Miles <br />18 <br />Underground Route Miles <br />59 <br />ISP Locations <br />36 <br />Signal Cabinets <br />42 <br />Byers' lump sum price for each phase including all travel and expenses is as follows. <br />• Phase 3 - $104,750 <br />Byers expects to utilize two survey crews with a lead performing ISP Inventories, they should be local in <br />Indiana River for 4-5 weeks performing these survey's. <br />PROJECT SCOPE <br />The final implementation for the entire IRC network has been subdivided into two project areas which are <br />identified on the map images below. The areas are; Red highlighted areas Pilot, Yellow Phase 2 and Blue <br />is Phase 3 <br />Copyright © 2019- Byers Engineering Company, Atlanta GA - All rights reserved 4 52 <br />