My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-207A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-207A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 11:15:25 AM
Creation date
1/26/2022 10:53:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/14/2021
Control Number
2021-207A
Agenda Item Number
8.I.
Entity Name
Ferreira Construction Southern Division Co., Inc.
Subject
Award of Bid for 66 th Avenue and 8 th Street
Signalization Project Improvements
Project Number
IRC-2002
Bid Number
2022007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -2002 <br />13.14 CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work not covered on the Contract Drawings. The FORCE ACCOUNT is <br />intended as a contingency for unforeseen work. Lump sum amount for FORCE ACCOUNT work <br />is included in the bid schedule. The value of force account work will be determined in accordance <br />with Article 12 of the General Conditions. <br />ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS <br />14.01 Unit Price <br />A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid <br />schedule. Omission of unit prices where required will result in disqualification of the bid. <br />B. The total of all estimated prices wile be determined as the sum of the products of the <br />estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract <br />Price will be determined in accordance with paragraph 11.03 of the General Conditions. <br />C. Discrepancies between the multiplication of units of Work and unit prices will be resolved <br />in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and <br />the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words <br />and figures will be resolved in favor of the words. <br />14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and <br />profit on account of cash allowances, if any, named in the Contract Documents as provided in <br />paragraph 11.02 of the General Conditions. <br />14.03 The Bidder's attention is called to the fact that any estimate of quantities of work to be <br />done and materials to be furnished under the Specifications as shown on the Bid Schedule, or <br />elsewhere, is approximate only and not guaranteed. The OWNER does not assume any <br />responsibility that the final quantities shall remain in strict accordance with the estimated <br />quantities, nor shall the Bidder plead misunderstanding or deception because of such estimate of <br />quantities or of the character, location of the work, or other conditions pertaining thereto. <br />ARTICLE 15 - SUBMITTAL OF BID <br />15.01 The Bid form is to be completed and submitted with the Bid security and the following data: <br />A. Sworn Statement under Section 105.08, Indian River County Code, on Disclosure of <br />Relationships. <br />B. Sworn Statement under the Florida Trench Safety Act. <br />C. Qualifications Questionnaire. <br />D. List of Subcontractors. <br />E. Certification Regarding Prohibition Against Contracting with Scrutinized Companies <br />Instructions to Bidders - 00200 - 8 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2002 66th Ave and 8th St Signalization\1-Admin\Bids\Bid Documents\DIV 0_1_Bidding Documents - 20210722.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.