Laserfiche WebLink
FERREIRA CONSTRUCTION CO., INC. <br />June 14, 2021 <br />Page Two <br />All prequalified contractors are required by Section 14-22.006(3), F.A.C., to <br />certify their work underway monthly in order to adjust maximum bidding <br />capacity to available bidding capacity. You can find the link to this report <br />at the website shown above. <br />Sincerely, <br />R <br />Alan Autry, Manager <br />Contracts Administration Office <br />AA: cg <br />