My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-207A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-207A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 11:15:25 AM
Creation date
1/26/2022 10:53:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/14/2021
Control Number
2021-207A
Agenda Item Number
8.I.
Entity Name
Ferreira Construction Southern Division Co., Inc.
Subject
Award of Bid for 66 th Avenue and 8 th Street
Signalization Project Improvements
Project Number
IRC-2002
Bid Number
2022007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJERREZRA Jerry Stine <br />Superintendent <br />Solar, Signal, and Lighting Division <br />Professional Summar <br />Mr. Stine is project superintendent on various heavy highway and heavy civil construction <br />projects with over 16 years of experience specializing in traffic signalization, lighting, and road <br />signing. He supervises and coordinates field construction forces and subcontractors through all <br />phases of construction. He works closely with Ferreira on-site foreman and subcontractors. <br />Jerry also communicates potential change orders to the project manager as soon as they become <br />known. He does this to ensure that a given job remains within budget and on time. As the <br />primary on-site construction point -of -contact for Ferreira, Jerry often manages and <br />communicates client concerns, problems, or complaints on assigned projects. This role also <br />requires him to conduct in-house inspections with subcontractors to verify work and challenge <br />quality prior to releasing them from the site. <br />Through Mr. Stines extensive experience, he has developed an unparalleled understanding of <br />blueprints, construction methods, and all construction codes as affected by state and local <br />ordinances, making him a key player and asset to the Ferreira team. <br />Professional Experience <br />Ferreira Construction Co., Inc. (2019 -Present:) <br />Mr. Stine serves as the Solar, Signal & Lighting Superintendent for Ferreira Construction <br />Southern Division Co., Inc. His extensive background has allowed him to gain valuable <br />experience supervising projects which include roadway lighting, high mast lighting, duct bank <br />and electrical bridge systems. <br />Valiant Power South, LLC (2015-2019) <br />Sola, Signal & Lighting Superintendent <br />The Signal Group, Inc. (2002-2015) <br />Area Superintendent <br />Achievements: <br />• Supervised construction activities in Martin, St Lucie, Indian River and Brevard County SGI <br />Offices <br />• Assisted expanding the SGI fleet and personnel to maintain and operate area facility and <br />warehouse <br />• Expanded in-house training programs for signalization, safety and operational management <br />requirements and supervised four county maintenance contracts <br />Key Proiects <br />Solar, Traffic Signalization, Signing and Highway Lighting Systems <br />• FCC Coleman Solar Photovoltaic Project, Federal Correctional Complex of Coleman, FL <br />• Crosstown Parkway Corridor, Segments IV, and V for the City of Port St Lucie <br />• Becker Rd Interchange for the City of Port St Lucie <br />• Jensen Beach Causeway <br />• Ernest Lyons Bridge <br />• US 1 Improvements throughout Martin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.