My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-008
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:31:19 AM
Creation date
2/4/2022 10:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/11/2022
Control Number
2022-008
Agenda Item Number
8.M.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Work Order No. 5 for Architectural/Engineering Services for
Fire Station #7, #05219VB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDLUND • DRITENBAS • BINKLEY <br />AACHiTECTS FIND ASSOCIATES, P.A. <br />65 Royal Palm Pointe,' te D <br />Vero Beach, FL 32960 <br />Ph. (772) 569-4320 Fax (7721569-9258 <br />Station #7 <br />Opinion of Cost <br />November 16, 2021 <br />Total 111 $250,440 <br />Project Grand Total $3,125,881 <br />NOTE: Opinions expressed in this report represent the professional opinion of the firm of Edlund, Dritenbas, <br />Binkley Architects and Associates, P.A. (EDB) who have used that degree of care and skill ordinarily exercised <br />under similar conditions by reputable members of our profession practicing in the same or similar locality. EDB <br />Architects, P.A. does not warrant that this opinion of probable construction cost will not vary from actual costs <br />incurred by the client. <br />Site Costs <br />A. <br />Site Development (on site) <br />$511,020 <br />B. <br />Irrigation <br />$23,495 <br />C. <br />Landscaping <br />$63,420 <br />D. <br />Fencing <br />$15,156 <br />E. <br />Soil Poisoning <br />3 600 <br />Subtotal $616,691 <br />Building Construction Costs <br />9,035 SF x $250.00/SF = <br />$2,258,750 <br />Total Construction Cost (I & II) $2,875,441 <br />Other Costs <br />A. <br />Architectural/Engineering Fees <br />5% of $2,875,441 = $143,770 <br />B. <br />MBV Civil Engineer Fee <br />$85,000 <br />C. <br />Carter Associates Survey <br />$20,670 <br />D. <br />Furnishings & Equipment <br />TBD <br />E. <br />Permits/Fees/Mist. <br />TBD <br />F. <br />Offsite Utility Extensions <br />TBD <br />G. <br />Offsite Road Improvements <br />TBD <br />Total 111 $250,440 <br />Project Grand Total $3,125,881 <br />NOTE: Opinions expressed in this report represent the professional opinion of the firm of Edlund, Dritenbas, <br />Binkley Architects and Associates, P.A. (EDB) who have used that degree of care and skill ordinarily exercised <br />under similar conditions by reputable members of our profession practicing in the same or similar locality. EDB <br />Architects, P.A. does not warrant that this opinion of probable construction cost will not vary from actual costs <br />incurred by the client. <br />
The URL can be used to link to this page
Your browser does not support the video tag.