My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mance with the design concept of the completed <br />Project as a functioning whole as shown or <br />indicated in the Contract Documents (unless there <br />is a specific statement indicating otherwise). The <br />use of any such term or adjective shall not be <br />effective to assign to ENGINEER any duty or <br />authority to supervise or direct the performance of <br />the Work or any duty or authority to undertake <br />responsibility contrary to the provisions of <br />paragraph 9.10 or any other provision of the <br />Contract Documents. <br />B. Day <br />1. , The word "day" shall constitute a <br />calendar day of 24 hours measured from <br />midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when <br />modifying the word "Work," refers to Work that <br />is unsatisfactory, faulty, or deficient in that it <br />does not conform to the Contract Documents <br />or does not meet the requirements of any <br />inspection, reference standard, test, or <br />approval referred to in the Contract Docu- <br />ments, or has been damaged prior to <br />ENGINEER's recommendation of final <br />payment (unless responsibility for the <br />protection thereof has been assumed by <br />OWNER at Substantial Completion in accor- <br />dance with paragraph 14.04 or 14.05). <br />D. Furnish, Install, Perform, Provide <br />1. The werd "fuFRiSh," mea e6ed <br />@nne6tl9n with services, materials, OF <br />4. When "furnish," "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context clearly <br />requiring an obligation of CONTRACTOR, <br />"provide" is implied. <br />E. Unless stated otherwise in the Contract <br />Documents, words or phrases which have a well- <br />known technical or construction industry or trade <br />meaning are used in the Contract Documents in <br />accordance with such recognized meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also <br />deliver to OWNER such Bonds as CONTRACTOR <br />may be required to furnish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish to CONTRACTOR up <br />to ten copies of the Contract Documents. Additional <br />copies will be furnished upon request at the cost of <br />reproduction. <br />2.03 Commencement of Contract Times; Notice <br />to Proceed <br />A. The Contract Times will commence to run on <br />the thirtieth day after the Effective Date of the Agree- <br />ment or, if a Notice to Proceed is given, on the day <br />indicated in the Notice to Proceed. A Notice to Pro- <br />ceed may be given at any time within 30 days after <br />the Effective Date of the Agreement. In no event will <br />the Contract Times commence to run later than the <br />ninetieth day after the day of Bid opening or the <br />thirtieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2.04 Starting the Work <br />A. CONTRACTOR shall start to perform the <br />Work on the date when the Contract Times com- <br />mence to run. No Work shall be done at the Site prior <br />to the date on which the Contract Times commence <br />to run. <br />2.05 Before Starting Construction <br />A. CONTRACTOR's Review of Contract Docu- <br />ments: Before undertaking each part of the Work, <br />CONTRACTOR shall carefully study and compare the <br />00700 - General Conditions REV 5-10-13.doc <br />00700-8 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1638 6th Avenue US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\13id Documents\Master Contract Documents\00700 - <br />General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.