My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Immediately after awarding the contract, but before the CONTRACTOR begins <br />work, the Project Manager will call a preconstruction conference at a place the <br />ENGINEER designates to establish an understanding among the parties as to <br />the work and to discuss schedules referred to in paragraph 2.05.6, procedures <br />for handling Shop Drawings and other submittals, and maintaining required <br />records. Utility companies and others as appropriate will be requested to attend <br />to discuss and coordinate work. <br />B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br />Contractor will certify to the Engineer the following: <br />1. A listing of on-site clerical staff, supervisory personnel and their pro -rated <br />time assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br />and a Retirement Plan, and, <br />4. Payment of Per Diem is a company practice for instances when <br />compensation for Per Diem is requested. <br />Such certification must be made by an officer or director of the Contractor with <br />authority to bind the Contractor. Timely certification is a condition precedent to <br />any right of the Contractor to recover compensations for such costs, and failure <br />to timely submit the certification will constitute a full, complete, absolute and <br />irrevocable waiver by the Contractor of any right to recover such costs. Any <br />subsequent changes shall be certified to the Engineer as part of the cost <br />proposal or seven calendar days in advance of performing such extra work. <br />FDOT Table 4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensation Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />Insurance* <br />Actual <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />2. Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />00800-2 <br />00800 - Supplementary Conditions REV 10-18.doe <br />00800 2F:\Public Works\ENGI NEE RING DIVISION PROJECTS11638 6th Avenue US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\Master Contract <br />Documents\00800 -Supplementary Conditions REV 10-18;doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.