My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />B. Information shown on the Drawincs as to the location of existing utilities has <br />been prepared from the most reliable data available to the Engineer. This <br />information is not guaranteed, however, and it shall be this CONTRACTOR's <br />responsibility to determine the location, character and depth of any existing <br />utilities. He shall assist the utility companies, by every means possible to <br />determine said locations. Extreme caution shall be exercised to eliminate any <br />possibility of any damage to utilities resulting from his activities. <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br />boxes, inlets and similar structures in the areas of construction that are to remain <br />in service shall be adjusted by the CONTRACTOR to bring them flush with the <br />surface of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to <br />the various utility companies. <br />+ + END OF SECTION + + <br />01541-5 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1638 5th Avenue US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.