My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br />Post Final Inspection <br />1.1 GENERAL <br />A. Approximately one year after Final Completion, the OWNER will make <br />arrangements with the Construction Coordination Manager and the <br />CONTRACTOR for a post final inspection and will send a written notice to said <br />parties to inform them of the date and time of the inspection. <br />B. Corrections of defective work noted by OWNER and Construction Coordination <br />Manager shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection, the OWNER will inform the CONTRACTOR of any <br />corrections required to release the performance and payment bonds. <br />001820 - Post Final Inspection rev 05-13.doc <br />001820-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1638 6th Avenue US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\Master Contract <br />Documents\001820 - Post Final Inspection rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.