My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 2 - Technical Provisions, IRC -1638 <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any circumstance. <br />2. Acceptable Material: FDOT #^ non -calcareous aggregate, washed and meeting the <br />requirements of FDOT Standard Specifications for Road and Bridge Construction, <br />Section 901. <br />Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to minimize <br />erosion and capture and remove pollutants from the construction site and from all other <br />areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide manufacturer/supplier's <br />recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and regardless of the <br />state of completion of the Work, immediately clean all dirt and debris from all pipes and <br />drainage structures; and repair all flooding, washouts, and all other erosion damage to the <br />Work. This responsibility shall not end until Final Acceptance of the Work by the OWNER. <br />Included is damage caused by erosion of any kind (e.g. wind, waves, stormwater runoff, <br />hurricanes, etc.) including Acts of God. Restore all erosion damaged areas to design grades <br />and elevations. Also, refer to General Conditions 6.13.B. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0104 1— Erosion Control - Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />Division 2 — Technical Provisions - 01025-11 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1638 6th Avenue US -1 b 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\DIV 2_TECHN'CAL PROVISIONS - <br />20201002.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.