Laserfiche WebLink
Division 2 - Technical Provisions, IRG-1638 <br />after the first paragraph of Subarticle 120-7.2: <br />Roadway Design Standard Index No. 505, Embankment Utilization Details is modified by the <br />addition of the following: <br />Any stratum or stockpile or soil which contains obvious pockets of highly organic material <br />may be designated as muck or unsuitable for construction of subgrade by the Owner. <br />Backfill material containing more than 2.0% by weight of organic material, as determined by <br />FM 1-T 267 and by averaging the test results for three randomly selected samples from each <br />stratum or stockpile of a particular material, shall not be used in construction of the <br />reinforced volume. If an individual test value of the three samples exceeds 3.0%, the stratum <br />or stockpile will not be suitable for construction of the reinforced volume. <br />No A-8 material permitted in embarkment. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0120 1— Regular Excavation - Per Cubic Yard <br />Bid Item No. 0120 6 — Embankment - Per Cubic Yard <br />SECTION 160 - STABILZING <br />The work specified in this item shall conform to Section 160 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0160 4 — Stabilization Type B — Per Square Yard <br />SECTION 286 - TURNOUT CONSTRUCTION <br />The work specified in this item shall conform, to Section 286 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 0286 1- Turnout Construction/ Driveway Base - Optional Materials - Per Square <br />Yard <br />Division 2 —Technical Provisions - 01025-17 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\163E 6th Avenue US -1 bo21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\DIV 2_TECHNICAL PROVISIONS - <br />20201002.docx <br />