My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-009
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:32:44 AM
Creation date
2/7/2022 10:33:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/11/2022
Control Number
2022-009
Agenda Item Number
8.O..
Entity Name
OHL, USA, Inc. and Subsidiaries
Subject
6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Project Number
IRC-1638
Bid Number
2022008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 2 - Technical Provisions, IRC -1638 <br />F. Preparation of Ground: The area over which the sod is to be placed shall be scarified or <br />loosened to a depth and then raked smooth and free from debris. Where the soil is <br />sufficiently loose and clean, the Owner, at his discretion, may authorize the elimination of <br />ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a range of <br />6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the second <br />application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per <br />acre, or 10 pounds per 1,000 square feet, by a spreading device capable of uniformly <br />distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets from bags <br />shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not practicable, the <br />fertilizer shall be spread by hand and raked in and thoroughly mixed with the soil to a depth <br />of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close contact <br />and shall be firmly and smoothly embedded by light tamping with appropriate tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered so as <br />to avoid a continuous seam along the line of flow. Along the edges of such staggered areas, <br />the offsets of individual strips shall not exceed 6 inches. In order to prevent erosion caused <br />by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as to produce <br />a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br />finished sod elevation is 11/2" below paved shoulder. <br />On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means of <br />wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br />Sodding shall not be performed when weather and soil conditions are, in the Engineer's <br />opinion, unsuitable for proper results. <br />Sod shall be placed around all structures, equipment pads, etc. <br />I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, as <br />determined by the Engineer, for optimum results. After being placed, the sod shall be kept <br />in a moist condition to the full depth of the rooting zone for at least 2 weeks. Thereafter, the <br />Contractor shall apply water as needed until the sod roots and starts to grow for a minimum <br />of 60 days (or until final acceptance, whichever is latest). <br />Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall include <br />Division 2 — Technical Provisions - 01025-21 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1638 6th Avenue US -1 to 21st Street Resurfacing (SCOP)\1-Admin\Bids\Bid Documents\DIV 2 TECHNICAL PROVISIONS - <br />20201002.docx <br />