Laserfiche WebLink
STATUS OF CONTRACTS ON HAND - OHL USA, Inc. - Updated 10/06/2021 <br />Give full information about all of your contacts, whether prime or subcontracts; <br />whether in progress or awarded but not yet begun; and -egardless of its location and with whom contracted. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 7 <br />CONTRACT (OR <br />BALANCE OF <br />UNCOMPLETED AMOUNT TO BE DONE BY <br />CLASSES OF WORK <br />OTHER ir�'�T) PROJECTS, OWNER, AND <br />SUBCONTRACT) <br />AMOUNT SUBLET TO <br />CONTRACT <br />APPLICANT <br />AS PRIME <br />AS <br />LOCATION OF WORK YOU ARE PERFORMING <br />AMOUNT <br />OTHERS <br />AMOUNT <br />CONTRACTOR <br />SUBCONTRACTOR <br />Portland cement concrete, electrical <br />work, grading, roadway paving, <br />South Corridor Rapid Transit <br />$ 368,233,500 <br />$ 131,868,900 <br />$ 236,364,600 <br />$ 197,667,500 <br />drainage, signage, fencing <br />Grading, roadway paving, drainage <br />Fort Denaud Road SR -80 Bridge Way <br />$ 1,079,000 <br />$ 605,600 <br />$ 473,400 <br />$ 186,200 <br />Major bridge, portland cement <br />concrete, electrical work, grading. <br />1-35 Ellis County North <br />$ 151,039,200 <br />$ 65,708,700 <br />$ 85,330,500 <br />$ - <br />$ <br />roadway paving, drainage, signage, <br />Texas Department of Transportation <br />fencing <br />Portland cement concrete, electrical <br />IH35@William Cannon, Austin, Texas, Travis <br />wo ,ge,R&grading, roadwbridgea paviing, <br />County <br />$ 85,861,0']0 <br />$ 57,251,500 <br />$ 28,609,500 <br />$ - <br />$ <br />dratraffic signal <br />Texas Department of Transportation <br />Portland cement concrete, electrical <br />1-35 Denton County <br />work, grading, roadway paving, <br />drainage <br />Texas Department of Transportation <br />$ 29,900,2)0 <br />$ 14,881,000 <br />$ 15,019,200 <br />$ 1,820,400 <br />$ - <br />minarbndge, <br />Major bridge, R&R bridge, portland <br />ment concrete, electrical work, <br />SH130 North Travis County <br />$ 42,196,9)0 <br />$ 15,894,300 <br />$ 26,302,600 <br />$ 216,300 <br />$ <br />grading, roadway paving, drainage, <br />Texas Department of Transportation <br />signage, fencing <br />Major bridge, R&R bridge, portland <br />cement concrete, electrical work, <br />SH 130 South Travis County <br />$ 59,893,2]0 <br />$ 23,739,100 <br />$ 36,154,100 <br />$ - <br />$ - <br />grading, roadway paving, drainage, <br />Texas Department of Transportation <br />signage, fencing <br />Portland cement concrete, electrical <br />work, grading, roadway paving, <br />US 287 Ellis County <br />$ 28,336,000 <br />$ 12,474,400 <br />$ 15,861,600 <br />$ - <br />$ - <br />drainage, R&R bridge, sidewalk, <br />Texas Department of Transportation <br />traffic signal <br />Major bridge, traffic signals, <br />Fairway Drive Grade Separation, Los Angeles, <br />arainage,elding,aldding, <br />seeding, sodding, <br />California <br />$ 148,402,6'00 <br />$ 41,727,600 <br />$ 106,675,000 <br />$ 15,645,900 <br />$ - <br />portland <br />grassing, portland <br />cement concrete, signage, sidewalk <br />Alameda Corridor -East <br />Demolition, CIP concrete, grouting, <br />Santa Ana River, Orange County, Californiaearthwork, <br />utilities, waterway and <br />manne construction <br />U.S. Army Corps of Engineers <br />$ 13,048,00 <br />$ 5,161,400 <br />$ 7,886,600 <br />$ - <br />$ - <br />Various locations, Los Angeles, California <br />Portland cement concrete, electrical <br />California Department of Transportation, <br />$ 10,753,0 ]0 <br />$ 3,658,700 <br />$ 7,094,300 <br />$ 87,700 <br />$ <br />work, grading, roadway paving <br />District 7 <br />Drainage, esd1dw.rk, grading <br />Carson Stormwater, City of Carson, California <br />$ 11,592,600 <br />$ 2,915,800 <br />$ 8,676,800 <br />$ - <br />$ - <br />City of Carson <br />Newhope Placentia Trunk Sewer <br />Demolition, MOT, utilities <br />Replacement, Anaheim, Califomia <br />$ 63,144,[00 <br />$ 14,584,000 <br />$ 48,560,000 <br />$ 1,697,700 <br />$ - <br />Orange County Sanitation District <br />Machado Pipeline, Los Angeles, California <br />MOT, utilities <br />Los Angeles Department of Public Works <br />$ 19,129,200 <br />$ 6,108,900 <br />$ 13,020,400 <br />$ 916,900 <br />$ - <br />Bureau of Engineering <br />Argo Drain Sub -Basin, Los Angeles, CA <br />Earthwork, drainage, utilities, <br />� g CI of Los Angeles Department of Public <br />$ 37,560,E00 <br />$ 14,647,300 <br />$ 22,913,500 <br />$ 476,800 <br />$ - <br />Portland cement concrete <br />Works Bureau of Engineering <br />Major bridge, repair and <br />rehabilitation, traffic signals, <br />King City Route 101 <br />$ 81,584,500 <br />$ 33,803,800 <br />$ 47,780,700 <br />$ 15,830,500 <br />$ <br />drainage, landscaping, portland <br />cement concrete, signage <br />California Department of Transportation <br />Water treatment plant <br />Valencia Advanced Water Treatment Facility, <br />$ 88,167,800 <br />$ 15,654,800 <br />$ 72,513,000 <br />$ 16,037,700 <br />$ - <br />Valencia California <br />Waterworks <br />San Gabriel River <br />$ 13,276,400 <br />$ 1,548,900 <br />$ 11,727,500 <br />$ 7,843,800 <br />$ <br />Concrete Barden Replacement <br />Valley Circle <br />$ 34,156,400 <br />$ 6,005,200 <br />$ 28,151,200 <br />$ 17,133,900 <br />$ - <br />Demolition <br />JPCP <br />Precast Jointed ConcretePavament <br />Glen Helen <br />$ 23,978,000 <br />$ 8,254,500 <br />$ 15,723,500 <br />$ 307,900 <br />$ - <br />Demoliticn <br />watemorks <br />Mission Trails <br />$ 30,016,200 <br />1 $ 6,515,000 <br />$ 23,501,200 <br />$ 5,834,400 <br />$ <br />Roadways <br />SR91 CorridorOperartions <br />$ 18,965,200 <br />$ 6,705,800 <br />$ 7,453,900 <br />$ 4,480,200 <br />Page 2 of 3 <br />