My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/2021
CBCC
>
Meetings
>
2020's
>
2020
>
11/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:11:17 PM
Creation date
2/10/2022 12:02:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/16/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each of these projects has minor impacts on the overall stormwater system for the landfill <br />property, several of which may require rerouting of existing utility or stormwater <br />infrastructure. The County has asked the Consultant specifically to provide additional <br />design services for the relocation of the two catch basins on the northern extent of the <br />biosolids dewatering area. The design will include moving the catch basins within <br />approximately 100 feet to the north of the existing location, extending the piping to <br />connect the new basins to the drainage network and regrading of the area to direct flow to <br />the new basins. This task will also include preparing an application for modification the <br />Indian River County stormwater permit (application fee to be paid directly by the <br />County). This task will also include minor coordination with the team designing the <br />evaporation system for project extents and tie in to proposed grade in that design. The <br />design effort in this task is limited to the relocation of the two catch basins and does not <br />include drainage design for the evaporation system. <br />Task 3: Site Plan Coordination <br />Similar to the needs outlined in Task 3, the County has requested the Consultant's <br />assistance in coordinating the site plan modification requirements of the non-Kimley- <br />Horn projects that are ongoing at the landfill. The Consultant's scope of work under <br />Work Order No. 45 (bypass scale modifications) includes a major site plan modification <br />to incorporate the proposed changes. As noted in Task 1, above, the yard waste receiving <br />area driveway improvements will be incorporated into the same site plan modification <br />application. The County prefers to complete a single, comprehensive site plan <br />modification to include the remaining projects. Therefore, this task will include <br />coordination with the design teams preparing the design for those projects and <br />incorporation into the single application to be prepared and submitted by the Consultant. <br />The Consultant will also prepare a planting plan for the site plan application to address <br />the relocation of the landscaping on the northern boundary of the biosolids facility (due to <br />the stormwater modifications). <br />This effort will be completed on an as -needed basis, as an hourly, not -to -exceed task. The <br />consultant will only provide services under this task when specifically requested by the <br />County. Work shall cease when funds are exhausted unless an amendment or subsequent <br />work order is approved by the County. <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.