My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coastal Waterways is providing construction administration services on the Oyster Bar Marsh <br />Driveway/Parking project authorized by PO# -00086284 under our Indian River County Agreement for <br />Continuing Engineering Services dated April 17, 2018, with Renewal and Amendment No 1. dated May 18, <br />2021. <br />This Amendment No.1 to our agreement includes compensation for Coastal Waterway's fee for additional <br />services due to the (a) consulting services required for resolution of the Contractor's over -excavation issue <br />and (b) additional services beyond the original scope agreement. The total amount of this additional fee <br />is $7,318.50 ($4,750.50 + $2,568.00). <br />a) Consulting services required for resolution of the Contractor's over -excavation issue ($4,750.50): <br />Coastal Waterways has performed consulting services at the request of County staff to identify and assist <br />in providing resolution to the Contractor unauthorized over -excavation at the site. Coastal Waterways <br />assessed the conditions at the site; reviewed the Contract Documents including the plans, specifications, <br />permits and other related documentation; notified the Contractor of the unauthorized work; responded <br />to Contractor correspondence and resolution proposals; met with the County staff and with the <br />Contractor via zoom meeting and on-site meetings. Ultimately the issue of over -excavation was brought <br />to an amenable resolution by County staff and construction of the project has resumed. The project <br />construction is nearly complete, although work by the Contractor has extended beyond the original <br />construction completion date. The work by the Contractor is not expected to result in an increase to the <br />cost of the project. <br />Coastal Waterways is seeking compensation for the additional time expended for consulting services <br />beyond the scope of our original agreement. Per our agreement we have documented the Coastal <br />Waterways staff hours and seek compensation of time expended per the schedule presented on the <br />worksheet below: <br />Dog <br />Staff Category _ <br />Fee <br />Hourly Rate <br />Hours <br />Description <br />............. <br />$ 4,75050 <br />255 <br />Z/17f2021 <br />Principal Engineer <br />$ 195:00 <br />$ 195 /hour <br />_....................._............................................................................................................ <br />1 <br />telecom with county staff including follow-up. <br />2/Y8J202Y <br />.............................................. <br />-............................. <br />Principal Engineer <br />..------ <br />$ 975.00 <br />.......................... <br />$ 195 /hour <br />........................... <br />- <br />5 <br />................... <br />letter response to CO request from XGD including research. <br />----- <br />---.........................•••...---••---•---------.......................................------- <br />2f29J2Y <br />- <br />Principal ncipal Engineer <br />$ 390.00 <br />------•-------._.........._ <br />$ 195 /hour <br />.................................---.......................................-----•------...................................................................---- <br />2 <br />- <br />review XGD response letter and contact county. <br />3/8/202Y <br />_.. _ <br />Principal Engineer <br />...............•-•--------------..................................------............-- <br />$ 390.00 <br />$ 195 /hour <br />2 <br />meet with Beth regarding county action. <br />---..................---•--............---•----------.._..........................-----------------... <br />3/10/202Y <br />--- - <br />Principal Engineer <br />Principal------------------..................................... <br />$ 390.00 <br />$ 195 /hour <br />2 <br />------........................................-------.........------...-.................-••--------------......... <br />prep and participate in zoom call. <br />3/10J2021 <br />-------------------• <br />Admin ......................................- <br />-• - --p- <br />$ 130.00 <br />•-...'0.0' . <br />$ 65 /hour <br />----19. <br />2 <br />-..............................t'io................ <br />- - <br />prep and participate in zoom call. <br />Principal Engineer <br />a'l <br />S -1 <br />5.............- <br />$ 195 Jhour <br />1 <br />••--s"y" n-•--...................-••• ...... - -t.y.`s....--........... <br />compaction/material synopsis requested for county staff. <br />3/Y2/202F <br />Principal Engineer <br />.............................................................................................--------. <br />*.... <br />$ 195.00 <br />$ 195 /hour <br />1 _.....................------.......---------..................----•---......................--•-----............ <br />create custom shop drawing submittal schedule <br />3/29/2021Principal <br />..-----........ <br />Engineer <br />................................ <br />$ 97:50 <br />$ 195 /hour <br />0.5 <br />review Beth Powell email draft <br />3/30..2021 <br />....... --.................. <br />Principal Engineer <br />........................-- <br />$ 5 85 .00 <br />----....... <br />- <br />$_--.195 /hour <br />------..............................•----............................-------.................................................. <br />-- <br />3 <br />-- <br />prepare and submit Engineer letter response <br />4/24/2021 <br />................................... <br />Principal Engineer <br />$ 390.00 <br />$ 195 /hour <br />2 <br />review remediation plan <br />4/25l202Y'Principal <br />..... - - <br />Engineer <br />- <br />---- ............... <br />$ 390.00 <br />_....... <br />$ 195 ..hour <br />-............'.'.'.*.............................r"" <br />- - <br />2 <br />- - ............ ............................:. - <br />-......_................................ ------ <br />review remediation plan <br />5/26..202Y <br />- - <br />Principal Engineer <br />-..--------------------------........................................ <br />$ 107.00 <br />$ 214 Jhour <br />.............. ...................... <br />0.5 <br />review Beth Powell email and provide comments <br />................................................------.............................................------......-- <br />6l25l2022 <br />--- ...................•- <br />Principal Engineer <br />$ 214.00 <br />$ 214 /hour <br />1 <br />remediation plan meeting with County PW Director <br />6..26!2021 <br />-•------------------.............----................................_...............- <br />Principal Engineer <br />$ 107.00 <br />$ 214 /hour <br />--........-------........................-------------..........................................-----------........ <br />0.5 <br />response to PW Director request for comment <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.