My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/07/2021 (2)
CBCC
>
Meetings
>
2020's
>
2021
>
12/07/2021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:52:09 AM
Creation date
2/10/2022 2:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/07/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2021-0442-FOF-EI <br />DOCKET NO. 20210001 -EI <br />PAGE 13 <br />No company -specific GPIF issues for Tampa Electric Company have been identified at this time. <br />If such issues are identified, they shall be numbered 15A, 1513, 15C, and so forth, as appropriate. <br />GENERIC GPIF ISSUES <br />ISSUE 16: What is the appropriate GPIF reward or penalty for performance achieved <br />during the period January 2020 through December 2020 for each investor- <br />owned electric utility subject to the GPIF? <br />Stipulation: <br />DEF: $2,657,279 reward <br />FPL: $6,390,846 reward. <br />FPUC: No position. <br />GULF: $1,642,650 penalty. <br />TECO: A reward in the amount of $3,673,726 for January 2020 through December 2020 <br />performance to be applied to the January 2022 through December 2022 period. <br />ISSUE 17: What should the GPIF targets/ranges be for the period January 2022 <br />through December 2022 for each investor-owned electric utility subject to the <br />GPIF? ' <br />Stipulation: <br />DEF: <br />Table 17-1 <br />GPIF Taraets/Ranaes for the period Januarv-December. 2022 <br />Source: GPW Target and Range Summary (Exhibit MIL -1 P, Page 4 of 76). <br />93 IR <br />Plant/Units <br />EAF ANOHR <br />Target <br />Maximum Target <br />Maximum <br />EAF <br />(%) <br />EAF <br />(oho) <br />Savings ANOHR <br />($000's) Btu/kWh <br />ANOHR <br />Btu/kWh <br />Savings <br />($000's) <br />Bartow 4 <br />82.04 <br />85.08 <br />191 7,758 <br />8,075 <br />6,738 <br />DEF <br />Crystal River 4 <br />69.57 <br />78.31 <br />6,846 9,472 <br />9,980 <br />5,809 <br />Crystal River 5 <br />74.10 <br />79.02 <br />3,714 9,802 <br />10,397 <br />5,895 <br />Hines 1 <br />89.40 <br />91.66 <br />304 7,705 <br />7,871 <br />944 <br />Hines 2 <br />89.32 <br />89.84 <br />194 7,550 <br />7,664 <br />751 <br />Hines 3 <br />93.62 <br />94.82 <br />168 7,394 <br />7,570 <br />1,653 <br />Hines 4 <br />85.09 <br />86.44 <br />201 7,057 <br />7,237 <br />1,888 <br />Totals <br />11.620 <br />23.677 <br />Source: GPW Target and Range Summary (Exhibit MIL -1 P, Page 4 of 76). <br />93 IR <br />
The URL can be used to link to this page
Your browser does not support the video tag.